ENGLISH
3
Operation and installation manual SOLIVIA 5.0 AP G3
Table of Contents
1 Scope of delivery
4
2 General warnings / Notes on safety
4
3 Introduction
5
4 System
5
4.1
Data evaluation and communication
5
4.2
Technical structure of the solar inverter
6
4.3
Equipment overview
7
5 Installation
8
6 Installation of equipment
8
6.1
Installation location
8
6.2
Minimum requirements
8
6.3
Maintenance
9
6.4
Installation
9
6.5
Ambient temperature
10
6.6
Grid connection
10
6.7
Connection of PV modules
11
6.7.1 Output power over PV voltage
12
6.7.2 Efficiency
13
6.8
Interface connection RS485 (EIA485)
13
6.9
Electrical connection and operational start-up
15
6.10 Setup / settings
16
6.11 LED operation and fault display
17
7 Operating concept
18
7.1
The display
18
7.2
Navigation in the display
18
7.3
Main menu
18
7.3.1 Submenu N (Now)
20
7.3.2 Submenu D (Day)
21
7.3.3 Submenu W (Week)
22
7.3.4 Submenu M (Month)
22
7.3.5 Submenu Y (Year)
22
7.3.6 Submenu T (Total)
23
7.3.7 Submenu S (Setup)
24
7.3.7.1
Submenu S: Solar ISO / GND
25
7.3.7.2
Submenu S: Firmware
25
8 Diagnostics and data evaluation
26
8.1
Malfunction rectification
26
8.2
Display messages
26
9 Technical data
28
10 Appendix
30
10.1 Connection examples
30
10.2 Overview of connection diagrams
32
11 Glossary
34
12 Certificates
142
Summary of Contents for SOLIVIA 5.0 AP G3
Page 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Page 38: ...36 SOLIVIA 5 0 AP G3...
Page 40: ...38 SOLIVIA 5 0 AP G3...
Page 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Page 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Page 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Page 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Page 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Page 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Page 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Page 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Page 74: ...72 SOLIVIA 5 0 AP G3...
Page 76: ...74 SOLIVIA 5 0 AP G3...
Page 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Page 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Page 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Page 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Page 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Page 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Page 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Page 109: ...107 SOLIVIA 5 0 AP G3...
Page 110: ...108 SOLIVIA 5 0 AP G3...
Page 112: ...110 SOLIVIA 5 0 AP G3...
Page 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Page 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Page 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Page 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Page 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Page 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Page 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Page 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Page 145: ...143...
Page 146: ...144...
Page 147: ......