background image

81

Operation and Installation Manual for SOL10.0-1TR3-E4 and SOL11.0-1TR3-E4

13. Maintenance and Repair

EN

13.  Maintenance and Repair

DAnGER

Risk of death by electrocution

Hazardous voltage is applied to the solar power 

inverter during operation. This potentially fatal 

voltage is still present for five minutes after all 

power sources have been disconnected.

 

► Never open the solar power inverter. The 

solar power inverter contains no components 

that must be maintained or repaired by the 

operator or installer. Opening the cover will 

void the warranty.

nOTE

The solar power inverter contains no compo-

nents that are to be maintained by the operator 

or installer.

13.1  Replacing the fan

The fan can be replaced by the operator if it is not working cor-

rectly.

Fig. 13.1: 

Replacing the fan

1.  Unplug the fan plug 

.

2.  Pull out the four fan retainers 

.

3.  Remove the fan 

.

4.  Fit the new fan 

.

5.  Press in the four fan retainers 

.

6.  Plug in the fan plug 

.

Summary of Contents for SOL10.0-1TR3-E4

Page 1: ...Operation and Installation Manual for SOL10 0 1TR3 E4 SOL11 0 1TR3 E4...

Page 2: ...bH All rights reserved This manual is included with our solar power inverter and is intended for use by the installer and end user The technical instructions and illustrations in this manual are to be...

Page 3: ...Navigating the Menu 13 5 4 8 Selecting a Submenu 13 5 4 9 Exiting a Menu 13 5 4 10 Setting Values 14 5 5 Electrical connections 16 5 5 1 Overview 16 5 5 2 DC connections and DC isolating switch 17 5...

Page 4: ...for VDE AR N 4105 grids 35 8 6 Commissioning for grids as per BDEW 38 8 7 Commissioning by loading the settings from another solar power inverter 41 8 8 Commissioning after replacing a solar power inv...

Page 5: ...2 1 2 Messages on display 74 12 2 Analyzing Failures 75 12 2 1 Procedure for External Events 75 12 2 2 Procedure for Internal Events 76 12 3 Overview of Failure Messages Troubleshooting 76 12 4 Loggin...

Page 6: ...cate these hazards DAnGER Indicates a hazardous situation An accident will result in death or serious injury WARnInG Indicates a hazardous situation An accident can lead to death or severe physical in...

Page 7: ...the local power grid for converting the direct current in the PV system to alter nating current and feeding it into the grid Use within the specified power range see 15 Technical data p 83 and under...

Page 8: ...s sioning may only be performed by an electrician using the in stallation and commissioning instructions found in this manual The solar power inverter must be disconnected from power and the PV module...

Page 9: ...cause injury if not handled properly The solar power inverter must be lifted and carried by at least two people b e c d f Check the scope of delivery for completeness Mounting plate a Operation and i...

Page 10: ...Connections Fig 5 1 Solar Power Inverter Components and Connections no Component Connection Description Status LEDs See Chapter 5 3 Status LEDs p 12 Display and Buttons See Chapter 5 4 Display and Bu...

Page 11: ...andards and settings see manual IP class IP65 5min Safety class 1 Ambient temp 25 C 70 C derating 55 C Fig 5 3 SOL11 0 1TR3 E4 type plate Information on the Type Plate Meaning of the Information 5 min...

Page 12: ...ach The first row contains the name and number of the currently dis played menu The second to fourth rows show the menu elements A small arrow in the third row shows the currently selected menu item 5...

Page 13: ...d 5 4 6 Button combinations The table lists special button combinations for the display buttons Buttons Action ESC Pressing the ESC and buttons at the same time displays the 100 Install Settings menu...

Page 14: ...1 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 9 Press the button to apply th...

Page 15: ...26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 Time 14 26 51 13 Press the button to apply the new value The value is adopted and...

Page 16: ...ctrical Connections no Designation Description DC Connections 5 5 2 DC connections and DC isolating switch p 17 AC Connection 5 5 3 AC connection p 17 Fan connection 5 6 Fan p 17 2 x RS485 interfaces...

Page 17: ...onitoring system can be connected The RS485 interfaces are internally wired 1 1 This means that both RS485 interfaces can be used as an input or an output If multiple solar power inverters are connect...

Page 18: ...em perature More exact information on temperature dependency is provided in the PV module data sheet The feed in voltage range of the solar power inverter defines the range of input voltages over whic...

Page 19: ...intended for the installer and should make analyzing and resolving problems easier The internal log helps Delta Solar Support when analyzing more difficult problems Reports The reports combine the va...

Page 20: ...n 7 1 1 General Instructions Possible noise emissions can be disruptive when the device is used in living areas Therefore choose your installation loca tion carefully Always use the mounting plate sup...

Page 21: ...and other solar power inverters when installing the device see Fig 7 2 p 21 Do not install two solar power inverters directly above one another Avoid direct sunlight Ensure adequate air circulation H...

Page 22: ...ng plate Retaining clip not included in delivery Screws 6 mm dowels for attaching the mounting plate to the wall At least four screws are required Drill and drill bits suitable for the wall material a...

Page 23: ...system installation must be satisfied UTE C15 712 1 VDE 0100 712 These requirements specify the minimum cable cross section and the protective measures required to prevent overheating due to high cur...

Page 24: ...C016 20E005 Not included in delivery Flexible 5 core cable L1 L2 L3 N PE with a conductor cross section from 4 0 mm2 to 6 0 mm2 Cable end sleeves suitable for the conductor cross section Cable strain...

Page 25: ...to 5 Nm and the cable housing to 1 2 Nm Insert the AC plug into the AC socket on the solar power inverter and tighten the locking ring to a torque of 6 to 8 Nm Fit a cable strain relief clamp directly...

Page 26: ...power inverter and the maximum allowed current load of the DC connec tions see Chapter 15 Technical data p 83 The DC MINUS connection is a socket A connection plug is required for the DC cable The DC...

Page 27: ...d in UTE C 15 712 1 Multi Contact UTE Kit Delta Part num ber Multi Contact UTE kit for SOLIVIA EU G4 TR EOE90000341 7 4 3 Establishing Connection 1 Check the polarity of the DC voltage at the DC conne...

Page 28: ...p 30 and during ongo ing operation see 10 6 RS485 EIA485 Settings p 54 Pin Assignments Pin Assignment 8 1 1 Reserved 2 Reserved 3 Reserved 4 GND 5 Reserved 6 Reserved 7 TX_A 8 RX_B 7 5 2 Required Too...

Page 29: ...elta Support RS485 Cover unused connections Fig 7 8 Connection of a single solar power inverter to a moni toring system via RS485 7 5 4 Connecting Multiple Solar Power Inverters 8 1 Data logger Termin...

Page 30: ...d the settings from other power invertors of the same type All Grid selection The most important commissioning step The grids are sorted by country For some countries several grids are available and a...

Page 31: ...TINENT Greece continental VDE 0126 1 1 GR ISLAND Greece islands VDE 0126 1 1 Netherlands NL VDE 0126 1 1 EN 50438 Poland PL EN 50438 Portugal PT EN 50438 Romania RO VDE 0126 1 1 Slovakia SK VDE 0126 1...

Page 32: ...rect the installation if necessary DC DISCONNECT OFF ON 2 Switch on the DC isolating switch The startup process of the solar power inverter will begin After the startup process and the automatic self...

Page 33: ...sing the buttons Press the button to apply the value Available date formats DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM DD YYYY MM DD Available time formats 12...

Page 34: ...reselect ESC to confirm ENTER 16 Press the button to complete commissioning or Press the ESC button to change settings Commissioning is now finished nOTE The solar power inverter offers some optional...

Page 35: ...anian Slovak Slovenian Spanish continue Language English Installation 4 Press the buttons to select continue and then press the button This displays the Load USB Data menu No Yes Load USB data 5 Press...

Page 36: ...If you change one of the val ues you must fill out the provided label after commissioning and place it next to the type plate nOTE The configured values can only be changed after commissioning with a...

Page 37: ...19200 ID 1 continue RS485 19 Press the buttons to select continue and then press the button The completion screen will be displayed to reselect ESC to confirm ENTER 20 Press the button to complete co...

Page 38: ...u No Yes Load USB data 5 Press the buttons to select No and then press the button The Grid Selection menu is displayed continue Grid DE MVD Grid selection 6 To change the grid press the button and the...

Page 39: ...To change a value press the button and then set the value using the buttons Press the button to apply the value nOTE If you change one of the val ues you must fill out the provided label after commiss...

Page 40: ...ration option RS485 termina tion resistor On Off Termination On Baudrate 19200 ID 1 continue RS485 19 Press the buttons to select continue and then press the button The completion screen will be displ...

Page 41: ...ll begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed continue Language English Installation 4 To cha...

Page 42: ...button to confirm each No Yes Change loaded values 12 Press the buttons to select No and then press the button The Date and Time menu is displayed nOTE If you wish to change the loaded values select Y...

Page 43: ...change settings Commissioning is now finished nOTE If the solar power inverter is configured to the DE LVD DK LVD or DE MVD grids you can also configure active and reactive power control see 10 9 Act...

Page 44: ...5 ID of the solar power inverter from which the data is to be loaded for example 001 2 Check all connections and cables for damage and correct seating Correct the installation if necessary DC DISCONNE...

Page 45: ...balancing was activated on the solar power inverter from which the data was loaded the following message appears activated Power balancing is If active or apparent power limitation was activated on t...

Page 46: ...9200 ID 1 continue RS485 16 Press the buttons to select continue and then press the button The completion screen will be displayed to reselect ESC to confirm ENTER 17 Press the button to complete comm...

Page 47: ...larm SOLIVIA 1 In the main menu press the buttons to select Produc tion Info and then press the button Day statistics Current data 400 Production info 2 Press the buttons to se lect the required stati...

Page 48: ...ned by pressing the button For a detailed description see Chapter 12 3 Overview of Failure Messages Troubleshooting p 76 Day Energy generation on the current day Ext Events Current operating state see...

Page 49: ...ent Data L1 L3 Freq ___Hz L3 Current ___A L3 Voltage ___V 415 Current data L3 416 Current data PV PV1 voltage Current DC voltage on MPP tracker 1 PV1 Current ____A PV1 Voltage ____V 416 Current data P...

Page 50: ...L1 f 50 00 50 10 Hz L2 f L3 f Minimum maximum frequency in the selected period for every phase L1 Imax L2 Imax L3 Imax Maximum AC current for each phase in the selected period for every phase L1 U 228...

Page 51: ...dure USB features Options Install settings Production info Diagnostic Alarm SOLIVIA 1 In the main menu press the buttons to select Pro duction Info and then press the button Month statistics Year stat...

Page 52: ...Page 63 10 2 Display language Menu 100 Install Settings Description Allows the display language to be configured Accessing the Menu Main Menu Install Settings Options Install settings SOLIVIA 1 In th...

Page 53: ...e value Configurable Parameters Display Text Designation Description Date Date format DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM DD YYYY MM DD Time Time forma...

Page 54: ...ched on Contrast Display contrast 1 10 10 6 RS485 EIA485 Settings Menu 140 RS485 Description Allows the ID and baudrate of the RS485 interface to be configured Accessing the Menu Main menu Install set...

Page 55: ...ts Day statistics Week stats Week statistics Month stats Month statistics Year stats Year statistics Total stats Total statistics History History Statistics for the last seven days the solar power inv...

Page 56: ...If a power limit was set during commissioning the percent value relates to the maximum active power that was set Example You have a SOLIVIA 5 0 EU G4 TR and the maximum active power Pmax at commission...

Page 57: ...he solar power inverter behaves as described in variant 1 However as soon as the grid frequency exceeds fStop the active power feed is stopped Active power feed will resume once the grid frequency fal...

Page 58: ...ilable for DK LVD DE LVD DE MVD grids This function can be used to determine a separate cos for four different power ratios P Pn see Fig 10 3 auf Seite 58 P Pn is the ratio between the current active...

Page 59: ...int A Point B Point C Point D cos inductive capacitive 10 kW 8 kW 5 kW Example SOLIVIA 10 EU G4 TR limited to 8 kW Fig 10 5 Effect of active power limitation on the cos P function This active power re...

Page 60: ...n to change the value Configurable Parameters Display Text Designation Description Cos Phi cos Defines cos to be the set value inductive capacitive 1 0 8 10 10 4 Reactive power constants Menu 520 Reac...

Page 61: ...nfirm Reactive PwCtrl Active PwCtrl 500 User settings 3 Press the buttons to se lect Reactive PwCtrl and then press the button Cos phi ind 1 00 Mode Fix cosPhi 520 Reactive PwCtrl 4 Press the buttons...

Page 62: ...um reactive current in the case of a symmetric failure 3 phases 0 100 Max I asym Maximum power asymmetrical Maximum reactive current in the case of an asymmet ric failure 2 phases 0 100 10 12 Shadowin...

Page 63: ...d menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard menu 800 Standard...

Page 64: ...N You can obtain this PIN from Delta Support Procedure for changing the grid Main Menu Grid Selection Grid Change You must provide a key in order to receive a PIN You will find the key in the 132 Grid...

Page 65: ...e under STUP_ TXT The stands for the RS485 ID of the solar power inverter e g 001 The RS485 ID is a number for identifying the solar power inverter The RS485 ID for all solar power inverters is set by...

Page 66: ...and then press the button A note on IP65 protection is then displayed protection will lose the IP65 Without cover you 2 Press the button to confirm The 300 USB features menu is then displayed Save set...

Page 67: ...ave the name Image hex and must be located in the main directory of the USB stick Rename the file correctly if necessary This requires a computer 1 Enable the USB interface see 11 3 Enabling disabling...

Page 68: ...features and then press the button A note on IP65 protection is then displayed protection will lose the IP65 Without cover you 3 Press the button to confirm The 300 USB features menu is then displaye...

Page 69: ...ayed Save settings Save swap data Create reports Load settings Service 300 USB features 4 Press the buttons to select Load Settings and then press the button The solar power inverter searches for avai...

Page 70: ...interface p 66 USB features Options Install settings Production info SOLIVIA 2 In the main menu press the buttons to select USB features and then press the button A note on IP65 protection is then di...

Page 71: ...protection will lose the IP65 Without cover you 3 Press the button to confirm The 300 USB features menu is then displayed Save settings Save swap data Firmware update Create reports Load settings 300...

Page 72: ...problems within the solar power inverter Warning Yes Failure No Change events Certain parameters can be changed manu ally in the display or externally via the service software All parameter changes ar...

Page 73: ...ounding failure simultaneously with other warning Insulation or grounding warning during normal operation Insulation or grounding warning during syn chronization Insulation or grounding warning simult...

Page 74: ...th Fault Failure For external events Ext Events For internal events Warning 3 digit number For a warning the yellow Failure LED flashes The solar power inverter con tinues to feed power into the grid...

Page 75: ...e attempting to resolve the failure If events from both categories occur simultaneously those in the internal events category take priority In this instance therefore Delta Solar Support should always...

Page 76: ...it number Please contact Delta Support Failure Internal failure Failure three digit number Please contact Delta Support L1 Voltage failure AC overvoltage or undervoltage on phase L Check the grid volt...

Page 77: ...fail The startup insulation is too low Check the insulation resistance at the DC side of the PV modules PV1 ISO running fail Operating insulation 150 k Check the insulation resistance at the DC side o...

Page 78: ...16 04 2012 17 25 36 481 External events 4 You can view the whole list by pressing the buttons Message Structure Each message consists of three lines defined as follows Begin 1014V Voltage too high 16...

Page 79: ...LVD 1 Line Failure number the higher the number the more current the failure 2 Line Date and time when the event occurred 3 and Other Lines Brief description of the failure s 12 4 3 Log for BDEW Menu...

Page 80: ...ower 90 Max power 100 16 04 12 17 25 36 S 482 Change events 1 Line Date and time when the external event occurred Source of the change D Display E External RS485 U USB Interface S System 3 Line Name o...

Page 81: ...open the solar power inverter The solar power inverter contains no components that must be maintained or repaired by the operator or installer Opening the cover will void the warranty nOTE The solar p...

Page 82: ...er inverter is very heavy see 15 Technical data p 83 Improper handling may result in injury The solar power inverter must be lifted and carried by at least two people 14 1 Decommissioning 1 Disconnect...

Page 83: ...t power Power factor configuration area 0 8 cap 0 8 ind 0 8 cap 0 8 ind Total harmonic distortion THD 5 at rated apparent power 5 at rated apparent power Nighttime consumption 1 3 W 1 3 W Typical leak...

Page 84: ...interfaces 2x RJ45 RS485 1x USB 1x I O interface 2x RJ45 RS485 1x USB 1x I O interface DC Isolating Switch Integrated Integrated Display 3 LEDs 4 line LCD 3 LEDs 4 line LCD General Specifications Mode...

Page 85: ...g sticker The UTE kit allows you to conform to the DC protection and signal requirements specified in UTE C 15 712 1 Multi Contact UTE Kit Delta Part number Multi contact UTE kit for SOLIVIA EU Solar...

Page 86: ...the ESC button for at least three seconds Go to menu opens 411 Current data Menu 411 Go to menu 2 Press the button to enter the menu number The first digit flashes 3 Use the buttons to enter the rst...

Page 87: ...features Updating firmware Save swap data Save settings Create reports Load settings Service 310 Service Status Monitoring 511 Power reduction Max P 510 Active PwCtrl Power reduction Power vs freq 51...

Page 88: ...Qmax L1 Qmin L2 Qmin L3 Qmin 431 Week stat AC 441 Month stat AC 451 Year stat AC 461 Total stat AC 420 Day Statistics Day stat AC Day stat PV Day stat ISO 430 Week Statistics 440 Month Statistics 450...

Page 89: ......

Page 90: ...9 Italy supporto italia solar inverter com 800 787 920 Free Call netherlands ondersteuning nederland solar inverter com 0800 022 1104 Free Call Austria service oesterreich solar inverter com 0800 291...

Reviews: