EN
➔
-------------------
Load swap data
Load settings
-------------------
Load USB data
8. Press the
buttons to select
Load Swap Data
and
then press the button.
→ The solar power inverter will then search for fi les on
the USB drive.
When fi les are found, the
Select RS485 ID
menu is
displayed.
nOTE
: If the message
No fi les
found
is displayed, make sure the
fi les are in the main directory of the
USB drive.
➔
ID: 1
Select RS485 ID
9. Press the
buttons to select the
ID
and then press
the button.
→ The data is then verifi ed and loaded.
A message is displayed when the loading process is
successful.
nOTE
: If the message
Pendrive
error
is displayed, make sure the
USB drive is properly inserted.
Press ENTER
Successful
Load data
10. Press the button to confi rm.
→ If the asymmetrical grid load balancing was activated
on the solar power inverter from which the data was
loaded, the following message appears.
activated
Power balancing is
→ If active or apparent power limitation was activated
on the solar power inverter from which the data was
loaded, the following message appears.
##.#W/##.#kVA
been limited to
of that inverter has
The maximum power
11. If the above mentioned messages appear, press the
button to confi rm each.
➔
-------------------
No
Yes
-------------------
Change loaded values
12. Press the
buttons to select
No
and then press the
button.
→ The
Date and Time
menu is displayed.
nOTE
: If you wish to change the
loaded values, select
Yes
. Commis-
sioning is then continued with grid
selection and is the same as the initial
commissioning.
➔
Time: 14:26:51
Date: 25.05.2012
-------------------
Date and time
13. To change the value, press the button and then set
the value using the
buttons. Press the button to
apply the value.
➔
continue
Time: 14:26:51
Date: 25.05.2012
-------------------
-------------------
Date and time
14. Press the
buttons to select
continue
and then
press the button.
→ The
RS485
menu is displayed.