Installing a 1U Front-Rack
You must configure the rails that are attached to the system.
1.
Attach the switch rails (inner chassis members) to the S6010–ON system
( items 1 and 2 in the following figure). Item 3 shows the detail for the
front standoff with the locking tab.
Figure 8. Attaching the Switch Rails
2.
After you have installed both switch rails, line them up on the previously
mounted Ready-Rails and slide the switch in ( item 1 in the following
figure) until it is flush with front of rack. About 3 inches before you fully
insert your system, the rail locking feature (items 2 and 3) engages to
keep the switch from inadvertently sliding out of the rack and falling.
16
Summary of Contents for S6010-ON
Page 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 2: ......
Page 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 6: ...4 ...
Page 34: ...32 ...
Page 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Page 40: ...4 ...
Page 68: ...32 ...
Page 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Page 74: ...4 ...
Page 102: ...32 ...
Page 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Page 108: ...4 ...
Page 136: ...32 ...
Page 139: ......
Page 140: ......