of the rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws.
See item 2 in the following figure.
3.
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. See
item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 5. Two-Post Flush-Mount Configuration
12
Summary of Contents for S6010-ON
Page 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 2: ......
Page 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 6: ...4 ...
Page 34: ...32 ...
Page 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Page 40: ...4 ...
Page 68: ...32 ...
Page 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Page 74: ...4 ...
Page 102: ...32 ...
Page 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Page 108: ...4 ...
Page 136: ...32 ...
Page 139: ......
Page 140: ......