Figure 9. Installing the S6010–ON in a Front-Rack Configuration
1.
Chassis.
2. Rail end.
3. Rail locking feature.
Completing the Ground Wire Installation
After you have installed the S6010-ON switch in a rack, complete the
installation of the ground wire.
You previously installed the GND lug and bracket assembly, with ground wire
attached, to the S6010-ON chassis (see
Installing the Ground Lug and Bracket
Assembly
).
You must supply:
17
Summary of Contents for S6010-ON
Page 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 2: ......
Page 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 6: ...4 ...
Page 34: ...32 ...
Page 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Page 40: ...4 ...
Page 68: ...32 ...
Page 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Page 74: ...4 ...
Page 102: ...32 ...
Page 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Page 108: ...4 ...
Page 136: ...32 ...
Page 139: ......
Page 140: ......