Figure 7. Four-Post Threaded Configuration
Install the System
You can mount the system in the 1U front-rack or 1U two-post (flush and
center) configurations. For the 1U two-post (flush and center) configurations,
slide the system into the rails in the same manner as the four-post
configurations.
The following is an example of a 1U front-rack configuration.
15
Summary of Contents for S6010-ON
Page 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 2: ......
Page 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 6: ...4 ...
Page 34: ...32 ...
Page 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Page 40: ...4 ...
Page 68: ...32 ...
Page 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Page 74: ...4 ...
Page 102: ...32 ...
Page 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Page 108: ...4 ...
Page 136: ...32 ...
Page 139: ......
Page 140: ......