Two-Post Center-Mount Configuration
To install the Dell ReadyRails system using the two-post center-mount
configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. See item
1 in the following figure.
2.
Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. See item 2 of the following figure.
3.
Repeat this procedure for the second rail.
Figure 6. Two-Post Center-Mount Configuration
13
Summary of Contents for S6010-ON
Page 1: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 2: ......
Page 3: ...Dell Networking S6010 ON Getting Started Guide Regulatory Model S6010 ON ...
Page 6: ...4 ...
Page 34: ...32 ...
Page 37: ...Guía de introducción de Dell Networking S6010 ON Modelo reglamentario S6010 ON ...
Page 40: ...4 ...
Page 68: ...32 ...
Page 71: ...Guide de mise en route du S6010 ON Dell Networking Modèle réglementaire S6010 ON ...
Page 74: ...4 ...
Page 102: ...32 ...
Page 105: ...Guia de primeiros passos do Dell Networking S6010 ON Modelo normativo S6010 ON ...
Page 108: ...4 ...
Page 136: ...32 ...
Page 139: ......
Page 140: ......