background image

D000024-000 Rev. A

Page i

Q

S i m p l i f y

SilverStorm 9000

Hardware Installation Guide

Summary of Contents for SilverStorm 9000

Page 1: ...D000024 000 Rev A Page i Q S i m p l i f y SilverStorm 9000 Hardware Installation Guide...

Page 2: ...SilverStorm 9000 Hardware Installation Guide Q Page ii D000024 000 Rev A...

Page 3: ...ons are suitable for the specified use without further testing or modification QLogic Corporation assumes no responsibility for any errors that may appear in this document No part of this document may...

Page 4: ...ation Guide Q Page iv D000024 000 Rev A 2007 QLogic Corporation All rights reserved worldwide First Published March 2007 Printed in U S A QLogic Corporation 26650 Aliso Viejo Parkway Aliso Viejo CA 92...

Page 5: ...Install the Rack Rails 9024 CU 9020 9040 9080 9120 9240 2 6 2 3 5 Install the Rail Hat Sections 9024 9020 and 9040 2 7 2 3 6 Rack Mount the Switch 2 9 2 3 7 Installing the Switch Fascia 2 11 2 3 8 Ho...

Page 6: ...SilverStorm 9000 Hardware Installation Guide Page vi D000024 000 Rev A Q B 2 Regulatory Compliance Information B 5...

Page 7: ...ection 1 describes the intended audience and technical support Section 2 describes the hardware installation and initial configuration tasks Appendix A provides product specification information Appen...

Page 8: ...s QLogic direct customers may contact QLogic Technical Support others will be redirected to their authorized maintenance provider Visit the QLogic support Web site listed in Contact Information for th...

Page 9: ...e MN 55344 3657 USA QLogic Web Site www qlogic com Technical Support Web Site support qlogic com Technical Support Email support qlogic com Technical Training Email tech training qlogic com North Amer...

Page 10: ...1 Introduction Technical Support 1 4 D000024 000 Rev A Q...

Page 11: ...ur post 19 rack to facilitate easy maintenance Universal mounting rail hole pattern identified in IEC Standard 297 Mounting holes flush with the rails to accommodate the chassis NOTE Operation is subj...

Page 12: ...manager mounted above connectors to avoid unnecessary weight on the cable bundles Bundle cable using velcro straps to avoid injuring cables Keep all ports and connectors free of dust Untwisted Pair U...

Page 13: ...stallation process refer to Appendix B 1 Check the installation site to verify the installation of cabinet power feeds rails and grounding 2 Unpack the equipment and inspect for any shipping damage An...

Page 14: ...n this section 1 If applicable remove the doors of the rack 2 Mark the rack allowing the applicable amount of vertical space to install each switch 3 Install the hat rail sections 9024 9020 and 9040 4...

Page 15: ...emblies One pair of top support rail assemblies 9240 only Two heyclips 9080 and 9120 Four heyclips 9240 only Kit Mounting Hardware 3 8 Square Hole containing 10 32 x 0 375 pan head Phillips screws Cag...

Page 16: ...les chassis fan side in the front of the rack NOTE The 2 front holes should match up with the top and bottom holes of the rail front flange All holes should correspond to the rail mounting positions 2...

Page 17: ...specific left and right part numbers Left switch rail 200595 Right switch rail 200594 Two additional ways to ensure that the rails are mounted on the correct side s of the switch Make certain that th...

Page 18: ...e hat rail has 8 holes 4 correspond to the left side of the chassis and 4 correspond to the right When installing the hat rails make certain that the top of the rail is installed the same on both side...

Page 19: ...nd from the front of the cabinet slide it onto the rails The fans and power supplies are on the front of the chassis leaf VIC modules are to the rear CAUTION Never lift the switch with the handles on...

Page 20: ...r side as shown in Figure 2 6 Figure 2 6 Top Rail Assembly a When complete the top rail assembly should look like Figure 2 7 Figure 2 7 Completed Top Rail Assembly Connect the top rail to rack with 1...

Page 21: ...of the fascia in place 2 3 7 1 Installing the Modules 9020 9040 9080 9120 and 9240 NOTE The purchased configuration for the SilverStorm 9000 is shipped fully populated Follow these steps when it beco...

Page 22: ...backplane As the module seats in the chassis the handles will begin to close 5 Push the handles in to fully close NOTE Be sure that all cards are fully inserted in their respective chassis slots and...

Page 23: ...ovide strain relief for the IB cable connector NOTE When handling IB connectors make certain to remove the connectors by pulling on the center of the lanyard only as shown in Figure 2 9 below Pulling...

Page 24: ...crossover serial cable for the console port The settings for the terminal emulation device should be 8 data bits no parity bits 1 stop bit 57600 baud Use VT100 emulation Flow control XON XOFF 3 Verif...

Page 25: ...m ands 5 To change the switch default IP address enter s et Chas s i s I pAddr h i paddr es s m net M as k where h ipaddress is the new IP address in dotted decimal i e xxx xxx xxx xxx format and m ne...

Page 26: ...the IP addresses are not unique collisions will occur causing IP operations to fail To update the IP address on a managed spine do the following 1 Ensure that the spine module is connected to a COM p...

Page 27: ...H z Conf i gur ed M em or ySi z e 0x08000000 ChannelI nt er l eaveBi t 0 Num berofM em Channel s 1 Tes t i ng m em or y M em or yt es t spas s CPU0 f l us hi ng caches L2 f l us h com pl et e St ar t...

Page 28: ...1 gat ewayi net g us er u f t p f t p pas s wor d pw bl ank us er s h f t p f l ags f 0x0 t ar getnam e t n s t ar t up s cr i pt s ot her o s be Loadi ng packagef r om f l as h devi ce i m age1 Boot...

Page 29: ...f ul l Dupl ex 0 f l owCont r ol 0 s be1 s peed 100 f ul l Dupl ex 1 f l owCont r ol 0 NOTE ThecommandspineipchangestheIPaddressfor image1andimage2 on each managed spine 2 3 7 5 Enabling 12X Ports 902...

Page 30: ...port using ports 16 through 18 do the following NOTE Ports are combined in groups of three sequentially For example each 9024 has the following possible combinations Ports 1 through 3 Ports 4 through...

Page 31: ...re 2 11 12X Port Statistics The first port of the group port 16 is shown as active and Up while the other two ports in the group are displayed as down and Disabled 2 3 7 6 SilverStorm 9000 Component L...

Page 32: ...ED associated with each hemisphere of the system This LED is Blue if Fabric Manager license is installed and enabled on this switch or if Subnet Manager is running anywhere else in the fabric 2 3 7 6...

Page 33: ...ue IB link status LED that provide the following indications On the logical link is up port is in the Active state Off the physical link is down port is in the Down state 2 3 7 7 2 Module Status LED T...

Page 34: ...Blink fast low signal to noise ratio SNR close to an error condition Off when an auto negotiation is in progress or an error condition exists 2 3 7 8 FVIC Fibre Channel Port LEDs 9020 9040 9080 9120...

Page 35: ...spine Off indicates that the management board is in the standby mode if the STAT LED is Green In a redundantly managed system if the Capable LED is also Green this would indicate the slave spine DDR S...

Page 36: ...s complete when it becomes visible within the Chassis Viewer GUI Listed below are the approximate times to fully update each module type Spines modules up to 4 minutes Leaf VIO modules up to 2 minutes...

Page 37: ...1 Place the unit into the slot Slowly slide the fan unit in until it engages into the connector 2 Using the panel screw push up to re engage the unit 3 Tighten the captive panel screw 2 3 8 3 Hot Swa...

Page 38: ...2 Installation Installation Tasks 2 28 D000024 000 Rev A Q...

Page 39: ...It is recommended to use rack with minimum of 36 depth to facilitate cable installation and routing Other physical attributes are shown in the table below NOTE The 9000 series MPFD products should no...

Page 40: ...0 264V AC 47 63Hz 1 Phase 2 2A max current at 100VAC Inrush Current 33A 115VAC 25 C cold start 16 5A 230VAC 25 C cold start Power Factor 0 95 Two IEC 320 connectors for independent AC inputs A 4 Cooli...

Page 41: ...Temperatures of all major heat producing components are continuously monitored by system management modules Fan speed is monitored and automatically adjusted by system management modules to maintain a...

Page 42: ...ependent DC outputs which are labeled as hemispheres see figure A 1 The lower hemisphere is powered by the lower 6 supplies and the upper hemisphere is powered by the upper 6 supplies There are four i...

Page 43: ...um configurations are shown in Table A 3 Additional configuration restrictions are documented in this section The maximum number of Virtual I O Controllers VICs per switch is shown in Table A 5 Table...

Page 44: ...red While DC redundancy is supported for all valid configurations AC redundancy is limited The maximum AC redundancy configurations for the 9120 and 9240 are displayed in Table A 6 Table A 6 9120 and...

Page 45: ...ct all power cords before servicing unit B 1 1 1 Anweisung 1 Ger t trennen Diese Komponente verf gt m glicherweise ber mehrere Netzkabel Trennen Sie alle Netzkabel bevor Sie die Komponente warten um d...

Page 46: ...and fingers out of the power supply bays and backplane areas B 1 3 1 Anweisung 3 Gefahr vor elektrischem Schock Um der Gefahr vor elektrischem Schock vorzubeugen halten Sie H nde und Finger den Netzt...

Page 47: ...ment 6 Equipment Installation Only qualified personnel should be allowed to install remove or replace chassis or modules B 1 6 1 Anweisung 6 Ger teinstallation Die Installation Entfernung oder Erneuer...

Page 48: ...se Module sind f r die Installation in MPFD Grundeinheiten der SilverStorm 9000 Serie vorgesehen Installieren Sie stets leere Module wenn Sie ein aktives Modul entfernen Diese verhindern dass Stromgef...

Page 49: ...nce that may cause undesired operation Canada ICES This Class A digital apparatus complies with Canadian ICES 003 Cet appareil numerique de la classe A est conforme a la norme NMB 003 du Canada Europe...

Page 50: ...Regulatory Compliance Information B 6 D000024 000 Rev A Q...

Reviews: