background image

6

 

 

2.

 

INTENDED USE OF BOILER.

 

 

DWS 

heating  boilers  are  intended  for  preheating  of  water  in  the 

central  heating  system  to  the  temperature  not  exceeding  90°C  on 

the 

boiler’s outlet and with operating pressure not exceeding 1.5 bar.

 

DWS boilers are intended for installation:

 

 

in the open heating system, in such case boiler should be installed and 

protected in the opened system acc. to the standard PN-B-02413:1991.

 

 

in  the  closed  heating  system,  if  the  thermal  protection  is  used  (e.g. 

thermal  safety  release  valve  with  automatic  filling,  series  544)  meeting 

the requirements of PN-EN-12828 and PN-EN 303-5.

 

 

 

 Hint!

 

DWS  boilers  are  approved  for  operation  as  heating  sources  in  a 

heating system where  the temperature of water does not exceed 

90°C.

 

DWS  boilers  must  be  installed  and  protected  in  an  open  system 

according to the standard PN-B-02413:1991 - Heating engineering. 

Protection  of  water  heating  system  in  an  open  system. 

Requirements.

 

DWS  boilers  installed  in  the  closed  system  should  be  protected 

acc.  to  PN-EN  12828:2006  -  Heating  systems  in  buildings. 

Designing of water central heating systems. In case of installation 

of a boiler is a closed system it should be protected in accordance 

with  the  standard  PN-EN  12828,  additionally  device  intended  for 

carrying off power excess should be installed in accordance with 

the standard PN-EN 303-5 Heating boilers. Part 5: Heating boilers 

fired with solid fuels with manual and automatic fuel charging with 

rated power of 500 kW

 

Heating  boilers  DWS  are  used  in  central  heating  systems  and  hot 

water  systems,  both  gravitational  and  pump.  They  are  intended  for 

heating  of  residential  one-family  residential  buildings  and  for  smaller 

public  utility  facilities.  These  boilers  can  also  cooperate  with  hot  water 

system through a heat exchanger.

 

 

 Hint!

 

According to the applicable regulations, that is:

 

 

the Notice of the Marshal of the Sejm of the Republic of Poland 

of 29 June 2018 (Journal of Laws of 2018, item 1351),

 

 

the Regulation of the Council of Ministers of 7 December 2012 

(Journal of Laws, no. 0/2012, item 1468),

 

 

Regulation  of  the  Minister  of  Economy,  Labour  and  Social 

Policy  of    July  9,  2003.  (Journal  of  Laws  of  2003,  no.  135,  item 

1269), boilers installed in the opened system in accordance with 

the  recommendations  given  in  the  service  manual  and  boilers 

with  rated  power  to  70kW  installed  in  the  closed  system 

installations,  in  accordance  with  the  recommendations  given  in 

the service manual, do not require an operation permit issued by 

the given Office of Technical Inspection.

 

While  the  boilers  with  rated  power  exceeding  70kW  installed  in 

the  closed  system  installation  can  be  used  only  based  on  an 

operation  permit  issued  by  the  given  Office  of  Technical 

Inspection.

 

Supervision  of  boiler  is  required  according  to  the  obligatory  regulations 

especially in the case when there is no power in the system - the result of 

stopping  of  circulating  pumps  can  be  no  heat  removal  what  can,  in 

consequence,  can  lead  to  the  sudden  increase  of  temperature  in  the 

boiler. Wherefore gravitational by-pass should be made, preferably on the 

differential  valve  which  in  case  of  current  shortage  will  automatically 

discharge excess of hot water from the boiler.  

 

 

  

 

 

The  boiler  combustion  chamber  is  equipped  with  a  removable  cast 

iron grate and an additional vertical grate protecting against falling out of 

the glowing fuel from the furnace after the opening of the doors.

 

The  ash-pan  chamber  is  located  below  the  combustion  chamber. 

Fuel, which is charged periodically on a cast-iron grate, is combusted and 

ash is gravitationally transferred to the ash-pan chamber.

 

Arrangement  of  charging,  furnace  and  ash  pan  doors  allows  easy 

access to cleaning of charging, furnace and ash pan chamber. Cleaning 

doors are located on the front wall.

 

Primary air necessary for a correct run of the combustion process is 

gravitationally supplied from the outside through the pivoting lid located in 

ash-pan and furnace doors and controlled using a draught controller.

 

Secondary air is supplied from the front side of the boiler through the 

system of ducts and the amount of secondary air is adjusted using a flow 

damper  installed  in  the  charging  doors  of  the  boiler.  Additionally,  the 

secondary is to the ceramic nozzle is led by the flow dampers located on 

the sides of the boiler.

 

Hot  flue  gas  gives  up  the  heat  by  flowing  through  the  steel  heat 

exchanger  consisting  of  a  system  of  vertical  and  horizontal  convection 

ducts, where they are cooled down  when the heat is given up. Swirlers 

are  located  in  the  horizontal  convection  ducts  to  increase  the 

effectiveness of heat exchange.

 

Cooled  flue  gases  leave  the  boiler  through  a  steel  flue  connected 

with a chimney flue.

 

4.

 

BOILER EQUIPMENT.

 

 

Heating boilers type 

DWS 

are delivered in the fully assembled state, 

with  charging  and  furnace  and  ash-pan  doors  as  well  as  with  thermal 

insulation made of mineral wool, covered with protecting jacket made of 

steel sheet.

 

Table 1. Equipment of the 

DWS 

boiler.

 

 

Standard boiler equipment

 

Unit

 

Quantity

 

Boiler operating manual

 

pcs.

 

1

 

Analogue thermometer

 

pcs.

 

1

 

Horizontal grate

 

pcs.

 

1

 

Pivoting lid*

 

pcs.

 

1

 

Tools for servicing the boiler

 

set

 

1

 

Cast-iron grate

 

pcs.

 

1

 

Draught regulator

 

pcs.

 

1

 

Swirlers

 

set

 

1

 

TMEL VT 1500 heat-resistant packing

 

pcs.

 

1

 

Additional equipment of boiler**

 

Unit

 

Quantity

 

Leveling legs

 

pcs.

 

4

 

Safety fittings

 

pcs.

 

1

 

BVTS thermostatic valve

 

pcs.

 

1

 

A release valve for thermal safety with 

automatic filling, series 544

 

pcs.

 

1

 

*installation on your own scope acc. to the assembly manual on pages 37-

38.

 

**optional equipment, extra paid.

 

 

5.

 

FUEL PARAMETERS.

 

Hard coal - pea coal, is use as primary fuel used for central heating 

boilers type DWS:

 

  

  

 

 

 

 

 

 

 

3. BOILER DESCRIPTION

 

 

 

 

DWS  boilers  are  executed  in  form  of  a  rectangular  prism,  with 

double walls reinforced with staybolts, enclosed from  the outside with a 

water jacket. The upper part of the furnace chamber is also enclosed with 

water jacket. Boiler design is based on a multi-draught structure of flues.

 

The  bottom  part  of  the  charging  chamber  covered  with  ceramics 

made  of  refractory  material,  executed  in  the  shape  of  a  nozzle,  is  a 

furnace of the boiler. The nozzle has a system of openings used to supply 

additional secondary air to the combustion process intended to increase 

the effectiveness of the combustion and flue gas emission. Secondary air 

is supplied from the side of the boiler through the system of ducts. A flow 

damper intended to adjust the amount of flowing secondary air is installed 

in the charging doors.

 

 

 

 

 
Correct coal type and assortment ensure:

 

 

fault-free operation of the boiler, 

 

 

fuel saving in comparison to lower-quality types,  

 

 

reduced emission of harmful chemical substances.

 

It is not acceptable to use plastics for starting-up fire on the draught 

furnace grate! It is forbidden to burn the following items on the grate:

 

•wet wood,

 

*chipboards or coated and non-coated board materials,

 

• calorific value Q

r

 

>28 MJ/kg 

• moisture W

r

 

≤7 %

 

• ash content A

r

 

≤5 %

 

• volatile matter content V

r

  

15-25% 

• granulation

 

 

20-25mm 

• sulphur content

 

 

< 0.6%

 

 

Note! 

Supervision of the device in form of every day control of 

operating parameters is required on grounds of the specificity of 

central heating solid fuel-

fired boiler’s operation. Continuous 

supervision of boiler is required in the case when there is no 

power.

 

 

Summary of Contents for CLEAN HEAT

Page 1: ...operating manual central heating boiler dws translation of original operating manual edition 12 January 2022 CLEAN HEAT...

Page 2: ...ation Module B type of project with the requirements specified in Directive 2014 68 EC have been carried out in the presence of the Office of Technical Inspection as the Notified Body UDT CERT No 1433...

Page 3: ...correctly filled copy of the Warranty Card to the following address DEFRO R Dziube a sp k Centrum Serwisowe Ruda Strawczy ska 103a 26 067 Strawczyn By sending back your warranty card you will be regis...

Page 4: ...LAINT FORM 31 20 COMPLAINT FORM 33 21 COMPLAINT FORM 35 List of tables Table 1 Equipment of the DWS boiler Table 2 Dimensions of the DWS boiler charging chamber and fuel charging hole Table 3 Basic di...

Page 5: ...rgin with respect to actual requirements resulting from the building heat balance All the most important information included in the operating manual is distinguished by marks pointing out the user s...

Page 6: ...nd ash is gravitationally transferred to the ash pan chamber Arrangement of charging furnace and ash pan doors allows easy access to cleaning of charging furnace and ash pan chamber Cleaning doors are...

Page 7: ...nace chamber the lowest dimension just over the grate and the biggest at the top of the chamber is given Table 2 Dimensions of charging chamber AxB1 B2xC and fuel charging hole D for DWS boilers Pictu...

Page 8: ...ion 11 connector for installation of return water temperature sensor 12 flue 13 connector for fan supporting the draught 14 flue cleanout opening 15 cover of the side cleanout opening I 16 side cleano...

Page 9: ...be stored in a non heated room under a roof and with efficient ventilation Prior to installation it is to be determined if all parts have been delivered and if they are in good technical condition In...

Page 10: ...flammable beech wood oak wood plywood C2 medium flammable pine wood larch wood spruce wood cork sawn wood boards rubber carpet C3 easily flammable asphalt ply celluloid mass polyurethane polystyrene p...

Page 11: ...not exceed 30 m Values of internal diameters of pipes protecting the boilers assumed according to PN 91 B 02413 are presented in the below table Table 6 Nominal and internal dimensions of safety and...

Page 12: ...re in a boiler The thermostatic head of the controller under the influence of the water temperature fluctuations using a lever and chain opens or closes a flap in furnace and ash pan doors increasing...

Page 13: ...sure by not more than 10 In case of exceeding of pressure set water outflows through the discharge conduit what results in a decrease of pressure in the system Water and steam outflowing from the valv...

Page 14: ...supply with cold water 7 20 19 18 17 2 13 p outflo w 1 boiler 2 domestic hot water pump 3 non return valve 4 central heating pump 5 floor heating pump 6 three way mixing valve 7 accumulation tank 8 t...

Page 15: ...ney will start from the level of the boiler room floor because flue gases getting out of the boiler should have a reflection possibility It is also important to have a cleanout opening with tight clos...

Page 16: ...t out through the charging hole seal Picture 15 Correct position of secondary air flow damper of nozzle during firing up the boiler Hint Before charging set the lever of the short cycle to OPEN this w...

Page 17: ...the factory settings 8 4 LOW TEMPERATURE CORROSION The boilers should be operated with differences between supply and return temperatures within the range of 10 20 C and return water temperature not s...

Page 18: ...is necessary in the case when low temperatures are maintained for a long time This operation is intended for increasing life of the boiler NOTE The above mentioned operations should be also absolutel...

Page 19: ...ves Required temperature cannot be reached too low fuel calorific value add fuel of higher calorific value or replace with fuel of required parameters too much chimney s draught use draught regulator...

Page 20: ...are to be removed immediately 8 In the winter it is not recommended to make heating breaks as water in the system can freeze which is particularly dangerous as starting up the boiler when the central...

Page 21: ...f purchase c brief description of fault d boiler protection system type of the expansion vessel e detailed address and phone number of the Purchaser If the following cases are complained about incorre...

Page 22: ...lements lack of spare parts at the supplier adverse weather conditions force majeure 6 Failure to carry out repairs within this period cannot constitute a ground for any claims against DEFRO R Dziube...

Page 23: ...d central heating system safety fittings in accordance with PN EN 12828 safety valve manometer air vent BVTS valve cooling coil pipe capacity of membrane expansion vessel in accordance with PN EN 1282...

Page 24: ...ire quenching system and pipe testing BVTS valve and FIREFIGHTER system checking connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Page 25: ...iler room distance from gear motor to wall on the side of the container II CENTRAL HEATING SYSTEM Notes central heating system open leading of expansion pipe in accordance with PN B 02413 1991 locatio...

Page 26: ...quenching system and pipe testing BVTS valve and FIREFIGHTER system checking the connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Page 27: ...operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in central he...

Page 28: ...28 17 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE No Date Fault description repaired elements description of repairs Notes Stamp and signature of Service 1 2 3 4 5 6 7 8 9 10...

Page 29: ...on an operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in cen...

Page 30: ...30...

Page 31: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault...

Page 32: ...32...

Page 33: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault d...

Page 34: ...34...

Page 35: ...ame and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fau...

Page 36: ...36...

Page 37: ...pivoting lid 2 1 Screw M5 2 pcs 1 2 Limiter 1 pcs 2 1 STEP 1 Slide the limiter on the locking screw STEP 2 Fix the limiter using M5 screws Picture 19 Installation of the limiter of the pivoting lid St...

Page 38: ...38 1 Levelling leg 4 pcs 2 M12 nut 8 pcs Picture 21 Installation of boiler leveling legs 2 1...

Page 39: ...39...

Page 40: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Page 41: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Page 42: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 77 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Page 43: ...and address of the equipment supplier DEFRO R Dziube a sp ka komandytowa 26 067 Strawczyn Ruda Strawczy ska 103A EQUIPMENT PARAMETERS UNIT MODEL IDENTIFICATION DWS 12 DWS 17 DWS 22 Energy efficiency c...

Reviews: