date, stamp and sign of
authorized DEFRO service
...............................................................................................
sign of user of the boiler
The following activities can be carried out upon checking the correctness of installation of the boiler in the
system
III. CONNECTION OF ELEMENTS TO ELECTRICAL SYSTEM
Comments
central heating pump
was connected
I have connected
domestic hot water pump
was connected
I have connected
additional pumps
was connected
I have connected
forced draught fan
was connected
I have connected
electronic controller
was connected
I have connected
fuel charger
was connected
I have connected
central heating pump sensor
was connected
I have connected
domestic hot water pump
sensor
was connected
I have connected
PID sensor
was connected
I have connected
additional sensors
was connected
I have connected
room controller
was connected
I have connected
IV. FITTINGS TEST
Comments
checking of sensors location
compatibility of sensors readouts with the reality
checking the direction of fan rotation
opening of fan flap under the influence of blow-in force
checking the direction of screw rotation
V. BOILER START-UP
Comments
checking of tightness of boiler hydraulic connection to the system
filling in the fire quenching system container
checking the tightness of the fire quenching system and pipe
testing BVTS valve and FIREFIGHTER system
checking connection of fuel charger container with the boiler
charging fuel container with fuel
checking coal charging by the charger
checking the location of top of coal cone in the retort
starting up boiler according to point 8.3. of operating manual
initial adjustment of boiler operation settings
instructing the user on using the controller
instructing the user on using the boiler
final adjustment of boiler operation settings
VI. PARAMETERS OF BOILER OPERATION
Type of fuel
.....................................................................................................................................................................................................................................................................................
PID controller
central heating temperature [°C]
Domestic
utility water temperature [°C]
if the boiler is not equipped with the PID controller, the following information is to be provided
fuel charging time [s]
fuel charging stoppage [s]
blow-in force [%]
operation modes
heating of house
boiler priority
pumps parallel
summer mode
fuel charger mode in fire-supporting mode [s]
fuel charger intervals in fire-supporting [mins]
fan in fire-supporting mode - operation time [s]
fan in fire-supporting mode - intervals [mins]
VII. CONFIRMATION OF USER’S TRAINING
Sign of user of the boiler
User confirms with own sign that he/she was trained within the scope of the following
operation of boiler controller and adjustment of the combustion process
adjusting fan rotation and location of fan flap
boiler maintenance
required fuel quality
safe operation of the boiler
action in emergency and complaint procedure