INSTALLATION INSTRUCTIONS
This boiler has been designed to heat water to a temperature lower than boiling point at atmospheric pressure.
It must be connected to a central heating system and to a domestic hot water supply system according to its performance
and power output.
Do the following before connecting the boiler:
a) Make sure that the boiler is adjusted to use the type of gas delivered by the gas supply. To do this, check the markings
on the packaging and the rating plate on the appliance.
b) Make sure that the flue terminal draft is appropriate, that the terminal is not obstructed and that no exhaust gases
from other appliances are expelled through the same flue duct, unless the latter has been specially designed to collect
exhaust gas from more than one appliance, in compliance with current laws and regulations.
c) Make sure that, if the boiler is connected to existing flue ducts, these have been thoroughly cleaned as residual products
of combustion may detach from the walls during operation and obstruct the flow of fumes.
To ensure correct operation and maintain the warranty, observe the following precautions:
1. DHW circuit:
1.1.
If the water is harder than 20 °F (1 °F = 10 mg calcium carbonate per litre of water), install a polyphosphate dispenser
or an equivalent treatment system, compliant with current regulations.
1.2.
Thoroughly flush the system after installation of the appliance and before use.
1.3.
The materials used for the product’s DHW circuit comply with Directive 98/83/CE.
2. Heating circuit
2.1. new system
Before proceeding with installation of the boiler, the system must be cleaned and flushed to eliminate residual
thread-cutting swarf, solder and any solvents, using suitable proprietary products. To avoid damaging metal, plastic
and rubber parts, only use neutral cleaners, i.e. non-acid and non alkaline. Recommended cleaning products are:
SENTINEL X300 or X400 and FERNOX Regenerator for heating circuits. Use these products in strict compliance
with the manufacturers’ instructions.
2.2. existing system:
Before installing the boiler, drain the system and clean it to remove sludge and contaminants, using suitable
proprietary products as described in section 2.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-alkaline such
as SENTINEL X100 and FERNOX Protector for heating circuits. Use these products in strict compliance with the
manufacturers’ instructions.
Remember that the presence of foreign bodies in the heating system can adversely affect boiler operation (e.g.
overheating and excessive noise of the heat exchanger).
Failure to observe the above will render the warranty null and void
.
The following notes and instructions are addressed to fitters to allow them to carry out trouble-free installation. Instructions
for igniting and using the boiler are contained in the ‘Instructions for Users’ section.
• This boiler can be connected to any type of double- or single-pipe convector plate, radiator or thermoconvector. Design
the system sections as usual, though, bearing in mind the available flow-head at the plate, as shown in section 25.
• Do not leave any packaging (plastic bags, polystyrene, etc.) within reach of children, as it is a potential source of danger.
• Initial lighting of the boiler must be carried out by an authorised Service Engineer, as indicated on the attached sheet.
Failure to observe the above will render the guarantee null and void.
ADDITIONAL PUMP WARNING
If an additional pump is used on the heating system, position it on the boiler return circuit. This will allow the correct
operation of the water pressure switch.
SOLAR WARNING
if the instantaneous (mixed) boiler is connected to a system with solar panels, the maximum temperature of the domestic
hot water entering the boiler must not exceed
60°C
.
12. GENERAL INFORMATION
13. INSTRUCTIONS PRIOR TO INSTALLATION
Summary of Contents for MS 24
Page 136: ...136 71 03982 03 BG 1 2 3 4 2 3 I 1 0805_2302 CG_2072...
Page 137: ...137 71 03982 03 BG 4 1 3 1 C 1 C 5...
Page 155: ...155 71 03982 03 BG 28 MS 24 MI MS 24 MI FF MS 24 MS 24FF 1 15 15 8 8 29 CG_2284 1009_2405 15...
Page 157: ...157 71 03982 03 BG 16H 16 32 16 CG_2078 1009_2201...
Page 162: ...162 71 03982 03 BG 34 24 MI FF CG_2075 1001_1806 C M N R G V B V NTC NTC...
Page 163: ...163 71 03982 03 BG 24 MI CG_2076 1001_1807 C M N R G V B V NTC NTC...
Page 164: ...164 71 03982 03 BG 24 FF C M N R G V B V M2 NTC CG_2271 1006_1603...
Page 165: ...165 71 03982 03 BG 24 C M N R G V B V M2 NTC CG_2272 1010_2101...
Page 235: ...235 71 03982 03 EL 1 2 3 4 4 2 3 RESET 1 Reset 0805_2302 CG_2072...
Page 236: ...236 71 03982 03 EL 4 1 3 1 C 1 C 5...
Page 251: ...251 71 03982 03 EL 2 3 2 3 2 0 5 bar 180 30 5 C 30 C 25 10 24 10 24 3 bar NTC 23 13 9912070100...
Page 256: ...256 71 03982 03 EL 16H 16 32 16 CG_2078 1009_2201...
Page 261: ...261 71 03982 03 EL 34 24 MI FF CG_2075 1001_1806 C M N R G V B V NTC NTC...
Page 262: ...262 71 03982 03 EL 24 MI CG_2076 1001_1807 NTC NTC C M N R G V B V...
Page 263: ...263 71 03982 03 EL 24 FF M2 NTC CG_2271 1006_1603 C M N R G V B V...
Page 264: ...264 71 03982 03 EL 24 M2 NTC C M N R G V B V CG_2272 1010_2101...
Page 268: ...268 71 03982 03 RU De Dietrich 2 3 1 0805_2302 CG_2072...
Page 269: ...269 71 03982 03 RU 4 5 1 3 1 1 1...
Page 279: ...279 71 03982 03 RU 17 230 3 3x0 75 2 8 9 2 L N L N 1 2 9 CG_2008 1009_0301...
Page 280: ...280 71 03982 03 RU 18 9 1 2 1 2 CG_2260 1006_1501...
Page 285: ...285 71 03982 03 RU 2 3 2 0 5 3 30 5 30 25 10 24 10 24 3 NTC 23 13 9912070100...
Page 286: ...286 71 03982 03 RU 2 2 19 2 2 24 25 1 1009_2401 1009_2402...
Page 288: ...288 71 03982 03 RU 28 MS 24 MI MS 24 MI FF MS 24 MS 24 FF 1 15 15 8 8 29 CG_2284 1009_2405 15...
Page 290: ...290 71 03982 03 RU 16H 16B 32 16 CG_2078 1009_2201...
Page 295: ...295 71 03982 03 RU 34 24 F C N R G V B V NTC NTC CG_2075 1001_1806...
Page 296: ...296 71 03982 03 RU 24 MI C N R G V B V CG_2076 1001_1807 NTC NTC...
Page 297: ...297 71 03982 03 RU 24 FF C N R G V B V CG_2271 1006_1603 2 NTC...
Page 298: ...298 71 03982 03 RU 24 C N R G V B V 2 NTC CG_2272 1010_2101...
Page 302: ...302 71 03982 03 CN 1 2 3 4 2 3 1 0805_2302 CG_2072...
Page 303: ...303 71 03982 03 CN 4 1 30 85 30 45 21 35 60 3 1 C C OFF 5...
Page 318: ...318 71 03982 03 CN 2 3 2 0 5 bar 3 30 5 30 E25 10 24 10 24 3 bar NTC NTC 23 13 9912070100...
Page 323: ...323 71 03982 03 CN 16H 16B 32 0808_2601 CG_2078 16...
Page 328: ...328 71 03982 03 CN 34 24 MI FF C M N R G V B V CG_2075 1001_1806 NTC NTC...
Page 329: ...329 71 03982 03 CN 24 MI CG_2076 1001_1807 C M N R G V B V NTC NTC...
Page 330: ...330 71 03982 03 CN 24 FF C M N R G V B V M2 CG_2271 1006_1603 NTC...
Page 331: ...331 71 03982 03 CN 24 C M N R G V B V M2 NTC CG_2272 1010_2101...