5. To modify the parameter, turn the rotary button.
6. To confirm, press the rotary button.
To cancel, press key
h
.
7. To go back to the main display, press key
j
2 times.
It is possible to use the
(
and
’
keys instead of the rotary
button.
6.2
Checks and settings before commissioning
6.2.1.
Preparing the boiler for commissioning
4
Check that the installation and the boiler are full of water and
correctly vented.
4
Check the tightness of pipe connections (fuel and water).
4
Check that the tank is correctly filled with fuel.
4
Check the water pressure in the heating system.
4
Check if the siphon is filled with water.
4
Check the electrical connections. Check for the presence of an
earth connection and its earth circuit.
4
Check that the condensates can flow freely.
6.3
Putting the appliance into operation
WARNING
Initial commissioning must be done by a qualified
professional.
1. Open the oil inlet.
2. Deblock the circulating pumps if necessary:
- Unscrew the guard plug at the front of the circulation pump.
- Insert a screwdriver into the slot in the circulation pump spindle
and turn the spindle several times to the right and left.
- Tighten the guard plug on the front of the circulation pump.
bar
1
1
2
2
r
c
STD
(
'
t
v
0
2
4
6
8
10
12
14
16
18
22
24
20
p
b
AUTO
x c
r
j
L
g
m
CURRENT PROG.C
"Choice of the timeprogram
applied C"
P4
a
C002222-C-04
bar
1
1
2
2
r
c
STD
(
'
t
v
0
2
4
6
8
10
12
14
16
18
22
24
20
p
b
AUTO
x c
r
j
M
g
m
LUNDI 11:45
C002224-D-04
2x
6. Commissioning
AFC 18 - AFC 24 - AFC 30
98
09/07/2015 - 300026439-07