The heat pump and the back-up are not authorised to operate at peak
rate.
Boost one-touch quick heating.
The 2 wires for the HP/HC signal must be connected to the terminal
block X11 on the water heater PCB.
For more information, see
List of parameters, page 52
Connection with direct peak rate/off-peak rate contact on the
counter
Fig.26
M002836-C
C1 C2
538 kW/h
1
0
15 / 45 A
500 mA
TEST
16 A
40 A
2 A
30
mA
L
N
X11-2 HP/HC
X11-1 LINE
A
1
2
3
4
4
1 Counter
2 Connection circuit breaker
3 AC-type/30 mA differential switch
4 Circuit breaker
A 1.5 mm
2
control
Set the parameter
to 2.
The heat pump and the back-up are not authorised to operate at peak
rate.
Boost one-touch quick heating.
The 2 wires for the peak rate/off-peak rate signal must be connected to
the terminal block X11 on the water heater PCB.
For more information, see
List of parameters, page 52
5 Installation
40
TWH 200 EV
EN-7602142 - v11 - 24042019