
MIOX AE Series Operators Manual
102-00085-E
Page
25
4. Wire the oxidant level switch by feeding wires into the unit through one of the spare feedthrough
fittings on bottom of the control box. If all of the feedthrough fittings have wires in them, it is
acceptable to feed two wires through one pass-through. The terminals for the oxidant switch are
shown
Appendix C – AE System Wiring Schematic
and
Figure 12
.
Figure 12 Oxidant Tank Level Switch Wiring to Control Box
When more than one system is installed, a jumper cable (3 wires) must be placed between pin 18 on
unit 1 and pin 18 on unit 2. Similarly pin 17 on unit 1 must be jumpered to pin 17 on unit two and pin
15 on unit 1 to pin 15 on unit 2. After all wires have been fed through, be sure to tighten the
feedthrough to prevent water damage.