
MIOX AE Series Operators Manual
102-00085-E
Page
10
Receiving and unpacking the AE Series OSG
Your AE™ Series OSG has been carefully packed to avoid shipping and handling damage. The OSG
enclosures are shipped in crated pallets. Brine generator tanks, oxidant tanks, water softeners, and
other ancillary equipment are also shipped on pallets. To safely unpack your OSG complete the following
steps:
NOTE: Do not store any portion of the OSG or related equipment outside before, during or
after installation.
Unpack the OSG enclosure
- Remove the crate from around the enclosure. Check the enclosure for
any damage that may have occurred during shipping.
Unpack the cell
- Check the cell for any damage that may have occurred during shipping. Save the
shipping materials for cell storage and shipping.
Unpack Installation Kits
- Remove the contents from the brine generator and oxidant storage tanks
(if provided). These items include the OSG installation kit, the solution tank level switch, the softener
installation kit, and the solution tank drop tube.
Unpack the water softener (if provided)
- Remove the water softener towers from their packaging.
Do not turn the softeners over or lay them on their sides as this will disturb the softening resin and
gravel beds inside the softener and affect softener performance.
Unpack all other equipment
- Remove any optional components (heaters, chillers, etc.) from their
packaging and inspect for damage. After completing a visual inspection, compare ordered items against
what was delivered. Should you find anything damaged or missing, please contact your MIOX sales
agent or MIOX Customer Service.