9
CONNECTING PERIPHERALS (CONT)
You can manually override the demand response mode (once during each demand response event) by
pressing the up and down buttons simultaneously which will return the chlorinator to normal operation
for a period of up to one hour. If the demand response event is still in progress after the override period
terminates, the chlorinator will again enter the demand response mode.
During installation, when connecting any external devices to the chlorinator mains power must be
disconnected. Wires sized AWG 26 gauge – 21 gauge (0.1 - 0.4mm²) can be used. Wires are routed through
the panel as shown below.
A foam seal is provided to allow wires entry and prevent water ingress. First, remove the seal from the cover
panel. Then, put the wires in a row and route them through the slit. Finally, put the seal back into the cover
panel making sure there are no gaps around the edges or between the wires.
Once external wires have been connected the cover panel must be screwed back into place before
restoring power.
Note: Your chlorinator complies with AS/NZS 4755 3.2 and will respond to DRM 1 type
commands only.
Summary of Contents for ProMatic 24
Page 26: ...26 35mm 1 3 8 80mm 3 5 32...
Page 27: ...27 NOTES...