vPad-TI OPERATING MANUAL
part of one test or AutoSequence (aka. CheckList or Procedure). In order to keep test data together,
it is possible to merge the safety test (or even a performance inspection using vPad-Check, vPad-
EQM or vPad-mT) with the test results of the vPad-TI app.
If it is desirable to merge the electrical safety test record and vPad-TI performance record, check the
Yes
box under
Merge with Safety Test
. Select the location where the safety test(s) will be found
from the list presented under
Safety Test Record Location
. It is expected that the safety test and
performance test will be done reasonably close together. Under
Date Range
, select the most
appropriate date range to find the most current safety test(s). The default is 2 days, but there are
also options for 1 week and All. Finally, in the
Save To
selection, the merged file can be directed to
the vPad-TI test records area, or saved back to the original safety test records location.
Figure 18
. Safety Test Records Location
Figure 19
. Safety Test Records Date Range
Figure 20
. Merge: ‘Save To’ Location
Operation/Chapter 4
#
Page 22
Summary of Contents for vPad-TI
Page 1: ...vPad TI Transport Incubator Tester Operating Manual MN 120 ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ...vPad TI OPERATING MANUAL 7 Calibration and Maintenance 73 ...
Page 16: ...vPad TI OPERATING MANUAL Specifications Chapter 1 Page 4 ...