Figure 2 - PCT-8000 First Run
After elaborating the passage of the parcel, the Master scanner again shows the
status of each node (of each scanner of the cluster) and then the
Continue
or
Stop
screen.
6. Repeat steps 3 - 5 changing the PCT-8000 X position (i.e. always before the PS Line
(reference point) and parallel to a conveyor edge but changing to the left-hand edge
and/or to the center of the conveyor), until the procedure terminates.
Figure 3 - PCT-8000 Second and Third Runs
Typically 3 passes are necessary.