2 … Periodic Maintenance
Monthly or Quarterly
—17—
Perform the following probe blowout procedure
quarterly and at times when pick failures occur
often. This interval is dependent on the amount
of machine use and air quality. Adjust your inter-
val as required. For example, preventing the
probes from drawing in air for long periods of
non-use—using Automatic Air Management
(see the on-screen Diagnostic Help) or manually
shutting air off to the probes while idle—can
reduce the need to perform this blowout proce-
dure as often.
Figure 8—Probe air-shut-off buttons on the Run
Window.
Probe Blowout Procedure
Tools Required:
• Standard (flat) screwdriver
• tape or method to mark tubes
• compressed air, clean and dry,
.48-.62
MPa (70-90 PSI)
1.
Stop the job if applicable. For instructions
see the on-screen Help.
2.
Switch power off.
3.
Push the E-Stop
Blow Out the Probes
4.
Open the cover and move the PNP Head
close for access to its far side.
5.
Locate the two clear tubes just to the far side
of the head cover, plugged into barbed fit-
tings. With a small flat screwdriver pry each
tube off its fitting, marking which tube goes
to which fitting.
Summary of Contents for FLX500
Page 4: ... Data I O FLX500 ii ...
Page 12: ... Data I O FLX500 Chptr 1 8 blank page ...
Page 28: ... Data I O FLX500 Chptr 2 24 blank page ...
Page 40: ... Data I O FLX500 Chptr 4 36 blank page ...
Page 42: ... Data I O FLX500 Chptr 5 38 Daily Sign off Clean the sockets page 10 Date Initials Notes ...
Page 43: ...5 Sign off Charts Daily Sign off 39 Daily Sign off Date Initials Notes ...
Page 44: ... Data I O FLX500 Chptr 5 40 Daily Sign off Date Initials Notes ...
Page 45: ...5 Sign off Charts Daily Sign off 41 Daily Sign off Date Initials Notes ...
Page 46: ... Data I O FLX500 Chptr 5 42 Daily Sign off Date Initials Notes ...
Page 48: ... Data I O FLX500 Chptr 5 44 Weekly Sign off Date Initials Notes ...
Page 52: ... Data I O FLX500 Chptr 5 48 blank page ...
Page 57: ... FLX500 ...