2 … Periodic Maintenance
Annual Maintenance
—23—
Figure 13—Two lubrication holes on plate.
5.
Slide the arm to the other side of the rail for
access to the plate on the other end of the
carriage.
6.
Repeat Step 4 for the plate on the other end
of the carriage.
7.
Slide the arm to the left and right and wipe
excess oil from the rail.
8.
Release the Emergency-stop button.
Annual Performance Verification
Performance verification uses the Diagnostic
Adapter Board (DAB) to provide a thorough
hardware test of the programmer electronics as
well as check that precision references are within
operating ranges.
Tools Required:
• 4 mm Hex Key (Allen wrench)
• DAB (Use PN below to purchase)
Once a year, perform the Performance Verifica-
tion using the DAB, or send the
FLX500
Program-
mer Modules to Data I/O for performance
verification. Include the PPH results from the
PV-Kit when sending the
FLX500
unit to Data I/O.
Data I/O Part Number
Diagnostic Adapter Board
910-2200-003
Summary of Contents for FLX500
Page 4: ... Data I O FLX500 ii ...
Page 12: ... Data I O FLX500 Chptr 1 8 blank page ...
Page 28: ... Data I O FLX500 Chptr 2 24 blank page ...
Page 40: ... Data I O FLX500 Chptr 4 36 blank page ...
Page 42: ... Data I O FLX500 Chptr 5 38 Daily Sign off Clean the sockets page 10 Date Initials Notes ...
Page 43: ...5 Sign off Charts Daily Sign off 39 Daily Sign off Date Initials Notes ...
Page 44: ... Data I O FLX500 Chptr 5 40 Daily Sign off Date Initials Notes ...
Page 45: ...5 Sign off Charts Daily Sign off 41 Daily Sign off Date Initials Notes ...
Page 46: ... Data I O FLX500 Chptr 5 42 Daily Sign off Date Initials Notes ...
Page 48: ... Data I O FLX500 Chptr 5 44 Weekly Sign off Date Initials Notes ...
Page 52: ... Data I O FLX500 Chptr 5 48 blank page ...
Page 57: ... FLX500 ...