Page 6 of 30
2.1 Pre-Installation Responsibilities and component packing list
This document is a guide to the steps that need to be performed to correctly install
the X740 Examination light. However, the work required to be performed is the
responsibility of the owner or designated contractor/s.
All fixings between DARAY lights and the building super-structure must be approved
by either the chief project engineer or an appropriate and competent structural
assessor.
The components supplied by DARAY for fitting / installation should be the following
items in the specified quantities.
X740LD/FDM/S
Qty.
X740LW
Qty.
12V Plug top transformer (1.8m)
1
12V Plug top transformer (1.8m)
1
Desk Clamp/Fixed Desk Mount/Desk
Stand
1
Wall b fixings
1
Light head and rigid arm system
1
Thumb Screw for Wall Mount
1
Microfibre cloth
1
Light head and rigid arm system
1
User Manual
1
Microfibre cloth
1
User Manual
1
X740LR
Qty.
X740LM
Qty.
12V Plug top transformer (1.8m)
1
IEC Cable (3m)
1
Rail Clamp
1
12V PSU + bracket kit
1
Thumb Screw for Rail Clamp
1
Mobile base (3 pieces)
1
Light head and rigid arm system
1
Light head and rigid arm system
1
Microfibre cloth
1
Microfibre cloth
1
User Manual
1
User Manual
1
X740LE1
Qty.
X740LE2
Qty.
12V Transformer
1
12V Transformer
1
BESA Wall Bracket (W3)
1
Spreader Plate Wall Bracket (W4)
1
Light head and rigid arm system
1
Light head and rigid arm system
1
Microfibre cloth
1
Microfibre cloth
1
User Manual
1
User Manual
1