D2-10 Series Two-Post Lifts
45
P/N 5900249 — Rev. B — February 2021
5.
Re-install the Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt.
6.
At the other Post, remove the Nut from the Threaded End of the other Equalizing Cable.
The Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt were previously removed. If
they were mistakenly re-installed, you need to remove them again.
7.
Route the Threaded End under the Sheave Bracket, then down the Post towards the Lift Head.
8.
Re-install both the Overhead Assembly Sheave, Sheave Pin, and Sheave Pin Bolt. See figures on
the next page.
⚠
WARNING
When the Cable adjusting nuts bottom out on the threaded end of the cable
connector and there is slack in the Cables, this indicates the Cables have stretched
beyond a safe useable length and need to be replaced with factory approved cable
assemblies. Do not place Washers, spacers or other devices to shorten the
effective cable length as damage to the Lift or injury to persons may occur.
9.
Put the Threaded End of the Equalizing Cable through the hole at the top of the Lift Head, then
install the Nut and securely tighten.
Pulley Plate
removed for
clarity.
Summary of Contents for D2-10 Series
Page 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Page 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Page 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Page 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Page 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Page 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Page 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Page 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Page 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Page 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Page 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Page 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Page 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Page 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...