D2-10 Series Two-Post Lifts
53
P/N 5900249 — Rev. B — February 2021
a Thermal Disconnect Switch
Additional information is supplied in the sections describing these tasks.
Wiring the Microswitch
This section describes how to wire the Microswitch;
installing
the Microswitch was described in
Installing the Overhead Assembly
The Lift comes with either one or two Microswitches, depending on the Power Unit:
Single-phase Power Units
. You need only one Microswitch, which must be wired between
incoming power and the Electrical Box on the Power Unit on one of the two “hot” wires.
Three-phase Power Units
. You need two Microswitches, which must be wired between
incoming power and the Electrical Box on the Power Unit on two of the three hot wires. Both
Microswitches you receive are identical.
Important
: If wiring
two
Microswitches, they
must
be wired on two
different
hot wires.
Refer to the diagrams in
for detailed Microswitch wiring information.
The following procedure assumes the Microswitch is already in place. If it is not, refer to
To wire a Microswitch
:
1.
Locate the Microswitch Cable (14/4 SJO, UL 62, 300 VAC) supplied with the Lift and the
Powerside Safety Cover.
2.
On the Overhead Assembly
, connect one end of the Microswitch Cable to the Microswitch (or
two Microswitches, for a 3 Phase Power Unit).
Refer to the diagrams in
3.
Route the Microswitch Cable from the Microswitch on the Overhead Assembly over to the
Powerside Post, down the
Powerside Post, out the hole in
the Post near the top of the Safety
Lock Release, and to the Electrical
Box on the Power Unit.
4.
Once the Microswitch Cable is
routed from the Microswitch to
the Power Unit, clip the
Microswitch Cable using the cable
clips on the Overhead Assembly
and the inside of the Powerside
Post.
Securing the Microswitch Cable
keeps it out of the way of the
other components.
5.
On the Power Unit
, open the
Electrical Box and wire the Microswitch Cable per the instructions in
Cable Clips
Summary of Contents for D2-10 Series
Page 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Page 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Page 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Page 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Page 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Page 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Page 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Page 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Page 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Page 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Page 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Page 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Page 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Page 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...