4.
Connect the Curved End of the Short
Hydraulic Hose to the 06 JIC connector of
the Tee Hydraulic Fitting; finger tighten the
connection.
This connection is made on the outside of
the Powerside Post. If the 06 JIC connector
of the Bulkhead Tee Hydraulic Fitting is not
on the outside of the Powerside Post, this
means the Tee Hydraulic Fitting was not
installed correctly. Return to
instructions.
5.
Connect the Straight End of the Short
Hydraulic Hose to the 06 JIC connector on
the Elbow Hydraulic Fitting; finger tighten the
connection.
6.
Use appropriate tools to securely tighten all
of the finger-tightened connections.
7.
Switching to the Offside Post
, take the
Long Hydraulic Hose and route it over the
Overhead Assembly toward the Powerside
Post.
8.
Make sure to put the Line through the Clips
in the Posts and in the Overhead Assembly
as you route the Long Hydraulic Hose.
9.
Connect the Straight End of the Long Hydraulic Hose to the 04 JIC connector facing up on the
Bulkhead Tee Hydraulic Fitting; finger tighten the connection.
10.
Using appropriate tools, securely tighten all of the finger-tightened connections.
Installing the Equalizing Cables
The two Equalizing Cables keep the Lift Heads synchronized as they raise and lower.
Both Equalizing Cables should have been put into position on the Posts before the Posts were raised,
which was covered in
Putting Equalizing Cables into Position
This section picks up where that section left off: the Button Ends of the Equalizing Cables (on both
Posts) have been installed, routed around the Post Sheaves, and then pushed up above the Lift Head.
They now need to be routed over the Overhead Assembly and then down to the top of the Lift Head.
Important
: If your Equalizing Cables are not yet in position, you must go back and put them into
position before performing the following procedure.
When Equalizing Cables are fully routed, they are mirror images of each other.
Summary of Contents for D2-10 Series
Page 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Page 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Page 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Page 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Page 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Page 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Page 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Page 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Page 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Page 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Page 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Page 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Page 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Page 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...