3.
Route the other end (the non-loop end) of the Safety Lock Cable under the Safety Sheave,
upwards on the inside of the Offside Post, up and over the Safety Sheave at the top of the Offside
Post, across the Overhead Assembly, over the Safety Sheave at the top of the Powerside Post,
and then downwards, on the inside of the Powerside Post, towards the Mounting Bracket.
Make sure the Safety Lock Cable stays on its Safety Sheaves; this keeps it out of the way of the
Equalizing Cables and the Hydraulic Hoses.
4.
On the Powerside Post
, when the non-loop end of the Safety Lock Cable is near the Mounting
Bracket, route it under the Safety Sheave, then push it out of the Powerside Post through a hole in
the Post.
The Powerside Safety Assembly is not yet installed, so just leave the non-loop end of the Safety
Lock Cable hanging out of the hole.
Important
: When connecting the ends of the Safety Lock Cable later in the installation, make
sure the Cable stays in all of the Safety Sheaves. This keeps it out of the way of the
Hydraulic Hoses and Equalizing Cables.
Both ends of the Safety Lock Cable will be connected during the procedure to install the Safety
Installing the Safety Assemblies
Installing the Safety Assemblies and the Safety Lock Cable
Your D2-10 Series Lift has two Safety Assemblies: one on the Powerside Post (above the Power Unit)
and the other on the Offside Post.
The two Safety Assemblies take the Lift off of its Safety Locks so the Lift Arms can be lowered. The
Safety Assemblies need to be disengaged at the same time so that the Lift Arms lower together. In
order to do this, the two Safety Assemblies are connected to each other via the Safety Lock Cable,
which is routed through the Overhead Assembly.
Routing the Safety Lock Cable was done earlier; refer to
additional information.
D2-10A
D2-10C
Pulley Plate
removed for
clarity.
Summary of Contents for D2-10 Series
Page 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Page 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Page 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Page 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Page 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Page 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Page 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Page 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Page 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Page 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Page 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Page 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Page 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Page 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...