D2-10 Series Two-Post Lifts
55
P/N 5900249 — Rev. B — February 2021
Not to scale. Your Power Unit may be slightly different.
Note
: The Up Button shown in the drawing above could be in a different location on the unit or
could be a switch instead of a button, depending on the Power Unit you have.
Make clear to your Electrician that all electrical work
must
conform to applicable local, state, and
federal codes, rules, and regulations, such as state and federal OSHA regulations and electrical codes.
To prepare the Power Unit
:
1.
Have the Electrician locate the Pigtail coming out of the Electrical Box on the Power Unit.
2.
Open the Electrical Box, remove the Pigtail, and then either:
–
Wire the Power Unit directly into the facility’s electrical system.
–
Wire a power cord (with appropriate plug)
inside the Electrical Box
to the wiring that was
connected to the Pigtail.
Wiring information is either on the outside of the Power Unit under the Electrical Box or inside the
cover of the Electrical Box. Have the Electrician use that wiring information to wire the Power Unit
to the power source.
3.
Wire the Microswitch(es) into the incoming power.
Refer to
4.
Fill the Hydraulic Fluid reservoir with approved Hydraulic Fluid.
The reservoir holds ~3.5 gallons of Hydraulic Fluid, depending on which Power Unit you have.
When you receive the Power Unit, the reservoir is empty; you need to fill it.
Summary of Contents for D2-10 Series
Page 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Page 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Page 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Page 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Page 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Page 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Page 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Page 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Page 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Page 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Page 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Page 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Page 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Page 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Page 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...