background image

ENGLISH

1.0 Handling

1.1  Storage

-  Storage temperature –20 … +65°C 

dry; free of dirt

-  The painting is only a primer, 

intending to guard against rust 

during stock or transportation.  Don’t 

damage the paintwork.

-  A desiccant or heating to prevent 

condensation is necessary in damp 

rooms.

1.2  Transport

-   Transport temperature  

–20° … + 65°C.

-   Protect against external force 

(impact, vibration etc.).

-   Don’t damage the paintwork

1.3  Handling before installation

-  If flange covers are fitted, remove 

shortly before maintenance !

-  Protect against atmospheric 

conditions e.g. wetness (applicate a 

desiccant).

-  Correct handling protects against 

damage.

2.0 Description

2.1  Scope of applications
 

Line regulating valves with a defined 

characteristic for heating and cooling 

systems. The plant designer is 

responsible for selecting the correct 

valve for the purpose.

Note:  

Do not use MSV-F valves for handling 

steam!

2.2  Operating principles
 

The valve is closed (cone/seating 

function) by turning the hand wheel 

clockwise. Do not use tools to increase 

the torque on the hand wheel. The 

valve spindle is sealed by an EDD 

double flexible seal system. The stress 

on the EDD double flexible seal system 

is relieved by the return seal when the 

valve is fully open. The position of the 

plug is shown on the digital display 

every complete turn and every tenth 

and five-hundredths of a turn.

3.0 Installation

3.1  General notes on installation
 

The following points should be taken 

into account besides the general 

principles governing installation work:
-  Remove flange covers if present.
-  There must be no foreign bodies 

inside the valve or piping.

-  Pay attention to the direction of   

flow: see markings on the valve

-  Valves can be installed with the   

spindle pointing in any direction, 

but the preferred spindle position is 

vertical.

-  Reference for isolation:
  If media-temperatures < ambient 

temperatures - ask manufacturer.

-  Installation upside down only if the 

medium is clean.

-  Centre packings between the fianges.
-  Connection flanges must mate 

exactly.

-  If the valve is handling steam, the 

piping must be laid with a gradient 

to prevent water from accumulating 

in pockets. Condensation traps are 

needed to prevent water-hammer.

-  All parts must be free from stress 

after installation.

-  The valve must not serve as a fixed 

point. It must be carried by the 

piping.

-  Protect the valve from dirt, especially 

during construction work.

-  Install compensators to  compensate 

for thermal expansion of the piping.

-  It is forbidden to heat the valve to 

above its service temperature (see 

data sheets), for instance by welding, 

grinding, etc.

-  To ensure that the valves function 

correctly, the pipe run should be 

straight for at least 2 × n.d. upstream 

and 6 x n.d. downstream of the valve.

3.2 Mounting the handwheel and display in 

lagged pipe runs

Removing the handwheel

1. Close the valve by hand (“0” position).
2. Unscrew the cap.
3. Lift off the handwheel with the 

attached digital display.

4. Insulation diameter: 

DN 65 - 200 = 87 mm 

Do not remove the insulation cap. 

Fitting the hand wheel and display

1. Set the handwheel with the  attached 

digital display in place.

2. Position the display (“0” position) on 

the side with the tapped hole.

3. Screw on the cap: 

DN 15 - 200 = 15 Nm

7369333-0 SIBC

 

VI.B1.B3.8U  ©  Danfoss 06/2006 

5

4.0 Throubleshooting

Fault

Possible cause

Corrective measures

No flow

Valve closed.

Open valve.

Flange covers not removed.

Remove flange covers.

Little flow

Valve not sufficiently open.

Open valve.

Dirt screen clogged.

Clean / replace screen. 

Relieve pressure first!

Piping system clogged.

Check piping system.

Valve difficult to move or cannot be opened Wrong direction of rotation.

Turn in correct direction (anticlockwise to open valve).

Valve spindle leaking

EDD-special spindle seal.

Replace valve or bonnet.

Relieve the pressure in the system first!

Leakage across valve seat

Valve not properly closed.

Pull hand wheel tight without tools.

Seat or plug damaged by foreign particles.

Replaced valve. Consult supplier/manufacturer.

Relieve the pressure in the system first!

Pressure difference too high.

Check system pressure and pressure drop  

(max. Δp =16 bar).

Reduce system pressure.

Medium contaminated (suspended solids).

Clean valve.

Install dirt screen upstream of valve.

Relieve the pressure in the system first!

Valve with stroke limiter cannot be opened  Stroke limiter on spindle stop has been tightened. Turn stroke limiter upwards.
Flange broken between valve and piping

Bolts tightened unevenly.

Mating flanges not properly aligned.

Realign piping and fit new valve !

Relieve the pressure in the system first!

Display does not show “0”/ 

0 when valve is closed 

Display not fitted properly after pipe was lagged.

Close valve, unscrew cap (23), remove hand wheel 

with attached digital display, set display to “0”/”0” and 

reassemble in reverse order. (See point 3.2).

False data recorded

PFM 90/2000/3000

False data displayed.

See point 3.2.

Observe operating = instructions for measuring 

instrument used.

Summary of Contents for MSV-F DN 15-400

Page 1: ...Instructions MSV F DN 15 400 7369333 0 SIBC VI B1 B3 8U Danfoss 06 2006 1 Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 DN 15 Fig 6 DN 20 Fig 7 DN 25 Fig 8 DN 32 2D 6D...

Page 2: ...2 VI B1 B3 8U Danfoss 06 2006 7369333 0 SIBC Fig 9 DN 40 Fig 10 DN 50 Fig 11 DN 65 Fig 12 DN 80 Fig 13 DN 100 Fig 14 DN 125...

Page 3: ...7369333 0 SIBC VI B1 B3 8U Danfoss 06 2006 3 Fig 5 DN 150 Fig 5 DN 200 Fig 5 DN 250 Fig 5 DN 300 Fig 5 DN 350 Fig 5 DN 400...

Page 4: ...3 3 5 6 8 7 12 75 18 3 39 3 41 3 40 4 62 4 44 9 54 5 115 587 825 1 019 1 409 6 25 3 7 6 9 1 13 2 19 1 41 3 44 2 44 70 9 50 57 2 123 602 856 1 059 1 464 6 5 4 4 6 5 9 7 15 1 20 5 42 8 47 47 7 79 6 56...

Page 5: ...g construction work Install compensators to compensate for thermal expansion of the piping It is forbidden to heat the valve to above its service temperature see data sheets for instance by welding gr...

Page 6: ...n Funktion ist vor dem Ventil eine gerade Rohrstrecke vom zweifachen Rohrdurchmesser vor dem Ventil und vom sechsfachen Rohrdurchmesser nach dem Ventil vorzusehen 3 2 Montage des Handrads und der Digi...

Page 7: ...tuyauterie Il est interdit de chau er la vanne au dessus de sa temp rature de service voir la che technique par exemple lors d op rations de soudage etc A n d assurer la vanne un bon fonctionnement l...

Page 8: ...nad jeho provozn teplotu viz datov list nap klad za elem sva ov n zbrou en apod K zaji t n spr vn funk nosti ventilu m b t pr b h trubky v okol ventilu p m alespo v d lce 2 n d d n jmenovit sv tlost p...

Page 9: ...ta u instalacji zawory nie mog by podgrzewane powy ej temperatury pracy Poprawna praca zaworu wymaga odpowiedniej d ugo ci odcink w prostych 2 DN przed i 6 DN za zaworem 3 2 Monta pokr t a i wska nika...

Page 10: ...10 VI B1 B3 8U Danfoss 06 2006 7369333 0 SIBC 1 0 1 1 20 65 1 2 20 65 1 3 2 0 2 1 MSV F 2 2 EDD 3 0 3 1 2 6 4 3 2 0 65 200 87 0 15 200 15 4 0 EDD 0 0 3 2 PFM 90 2000 3000 3 2...

Page 11: ...e vo tuv nuo purvo ypa atliekant statybos darbus Sumontuokite kompensatorius kad b t kompensuojamas terminis vamzdyno i sipl timas Draud iama kaitinti vo tuv iki auk tesn s negu leistina aptarnavimo t...

Page 12: ...c Para asegurar un correcto funcionamiento la tuber a debe tener un tramo recto al menos de 6 veces el di metro aguas arriba y dos veces aguas abajo de la v lvula 3 2 Montaje del volante y el indicado...

Reviews: