Dancover TITAN Arch 320 Manual Download Page 2

Dear clients!

After making the decision of buying a greenhouse you received a carefully made item. Its 

framework is made from special (1mm of thickness and 78mm width) profiles produced 

from galvanized metal which are extremely strong.

Due to uncomplicated instruction this greenhouse is easy to construct.

Because of additional items, you will be able to accomplish your ideas.

We keep the rights to make variations associated with the improvements of technolo-

gies. Some pictures and instructions may be different because of that.

We wish you a lot of joy and success with our greenhouse.

Attention!

Always use protective  work measures (safety gloves, clothes) when constructing the 

framework of the greenhouse and working with polycarbonate cover.

Tools you will need for the construction:

• Hexagon wrench with the diameter of 8 mm or wrench with open end.

• Cross-head screwdriver or screwdriver for battery

• Shovel to dig pits

• Spirit level to measure equability of the ground.

• Rope to measure the diagonal

• Knife to cut polycarbonate sheets

If necessary, follow the instructions from local building area.

In case of strong wind or storm close the windows and doors.

Before starting the construction, you should read all the instruction at least once and 

understand different sections and profiles. This is a helpful guide for you. 

Compare the 

list of parts with the parts in the package. Then sort out the sections and leave them in 

separate places.

It is highly recommended to screw the screws easily with hands at first – if needed, you 

will be able to rotate sections. After the construction, you should measure equability of 

the framework and only then tighten the screws.

1

Summary of Contents for TITAN Arch 320

Page 1: ...14 05 2019 for Greenhouse TITAN Arch 320 Manual...

Page 2: ...onate cover Tools you will need for the construction Hexagon wrench with the diameter of 8 mm or wrench with open end Cross head screwdriver or screwdriver for battery Shovel to dig pits Spirit level...

Page 3: ...ides of the foundation basis 4000mm 2 2 4 4 12 Extension of the side of the founda tion basis 1965mm 2 2m 2 2 13 Front and back parts of the founda tion basis 3000mm 2 2 2 2 2 14 Angles of the foundat...

Page 4: ...he equipment If you received only big 2 10x6 00m sheets 6 m2 2 pc 12 m2 3 pc etc All these parts should be cut from 2 10x6 00 m 1 sheet 5 The top part of the door 1050x990 1 1 1 1 1 6 The bottom part...

Page 5: ...ed to cut sheet with electric disc saw saw or sharp knife ATTENTION If you received 2 10x6 00 m sheets and additionally 1 05x2 00 m you shouldn t cut big sheets like it is shown in the scheme Big 2 10...

Page 6: ...re equal tighten the screws of the foundation basis 2 fig 5 For bigger than 12m2 greenhouse in order to increase the length of the basis Plates for linking the foundation 15 are used They are screwed...

Page 7: ...or digging in To the bot tom of Side bottom stilt of the arch NO 3 screw Pillars to the ground NO 4 with the screws M5 12 16 and internal screws M5 19 5 fig 5 fig 6 Construction of arches The most com...

Page 8: ...basis 7 1 fig 7 2 fig 8 To already constructed and screwed to the foundation arches you should attach five fastenings of the archs crossbars NO 5 with screws M5 12 16 and internal screws 19 8 1 fig Ve...

Page 9: ...uld screw fastening angles of the stilt and polycarbonate On the each side you should use 9 pcs small angles 23 and 2 pcs big angles 22 Positions of angles measuring from the foundation from left to r...

Page 10: ...No 8 should be attached to foundation basis and collected arches with the screws M5 12 16 and internal screws 19 With the front of the foundation basis 13 it is attached directly with the screws M5 12...

Page 11: ...screws M5 19 11 1 11 2 fig 11 1 fig 11 2 fig 12 By the part NO 8 and angles of attaching polycarbonate and stilt Small angle 23 screw directly Side fastenings of the front back part 900mm No 9 to Sti...

Page 12: ...After collecting the framework of the greenhouse cut the polycarbonate based on the given measurements and attach it to the framework Attach sheets of polycarbonate Scheme for cutting polycarbonate 1...

Page 13: ...should be placed from the bottom to the top along the one side Poly carbonate is attached with screws M5 12 16 and internal screws M5 19 and gasket slides 20 On one band of the arch are are 5 five att...

Page 14: ...on door window All parts packed in door equipment should be joined to square DOOR No 1 DOOR No 2 DOOR No 3 with screws M5 12 16 and in ternal screws M5 19 Screw Transverse part of the door to the cons...

Page 15: ...rews M5 19 and gasket slides 20 to the door frame Polycarbonate ends of the door window must be sealed with protective band for seal ing plates 25 Join handles 21 to its place 19 fig Make a hole in po...

Page 16: ...0 germany dancover com Switzerland 0840 000125 schweiz dancover com France 0975 181 800 france dancover com Austria 0662 626935 austria dancover com Sweden 040 233 262 sverige dancover com Finland 0 9...

Reviews: