
16 fig
17. Another sheet of polycarbonate (10)
should be placed on top of the fitted sheet.
Screw it only on attachment points same
like in the step 16. Polycarbonate sheets
should be equal to the side of foundation
basis both in front and back. The front and
back polycarbonate sheets should be flush
with the edges of the foundation (17 fig.).
17 fig
18. Construction on door-window. All parts packed in door equipment should be joined
to square. (DOOR No. 1; DOOR No. 2; DOOR No. 3) with screws M5-12 (16) and in-
ternal screws M5 (19). Screw Transverse part of the door to the constructed framework.
Part of the door with hinges must be screwed to Stilt of the door - window with screws
M5-12 (16) and internal screws M5 (19) (18.2 fig.).
NOTE: Door must be attached to the stilt of the door while being opened and with
the extended hinge to the hole, through polycarbonate (18.1 fig.).
18.1 fig
13
Opened doors
Closed doors
Polycarbonate
attachment points