www.daisalux.com
23
LPS24
– USER MANUAL
Period (days):
It indicates the interval of days to the next automatic functional test.
Test time:
Defines the time that the periodic functional tests are carried out (shared
with duration tests).
Cancel test/Launch test:
Enables a functional test to be run manually or cancelled if it
is running. One option or another or none is displayed depending on the status of the
device
The system will perform a functional test automatically according to the frequency and
time configured for the test. If on that date, if the system determines that it is not
possible to perform the test (power failure, fuse fault, etc.), it will be postponed to the
following day at the same time.
The functional test can be run manually whenever desired from the display or remotely
using the Daisatest Evac, WinCb or LPSWeb applications.
8.2.2.2. Duration test
Displays information about the last duration test made (date and percentage versus the
device’s nominal dur
ation) and enables configuration of the test execution options.
Overview
OK
Main menu
>
Test
OK
Mode
>
DURATION TEST
Last test:
07/05/16
100%
*Automatic:
yes
*Period (days)
365
* Test Time:
23:30
*Weekday:
Sunday
Status:
on course
#Schedule test
07/12/2016
#Run test
Func
Dur
Cap
Last test
:
Indicates the date (mm/dd/yy) and result of the last duration test performed.
•
Cancelled (circuit f.)
: a test was run but was cancelled in advance as a fault was
detected in a circuit.
•
Percentage
: the percentage with respect to nominal duration.
•
-:
No test was run.
Automatic (yes/no)
: defines whether the duration test is performed automatically.
Period (days)
:
Indicates the minimum interval of days between the duration tests.
Test time
:
Defines the time that the periodic duration tests are carried out (shared with
functional tests).
Weekday
:
set a specific day of the week to run the periodic test.
Status
:
indicates the current status of the duration test (
on course/not
active/scheduled
).
Programme test/Unprogramme test:
Allows you to programme or unprogramme a
duration test to run on a specific date. The interval is a maximum of one year from the
last duration test carried out or one month from the current date.
The test will be performed at the
established
test time.
Depending on the country, the conditions (period) of the functional
tests are determined by the applicable regulations.
Set the test interval
in accordance with the legislation.