Only proceed with wiring work after blocking off all power.

Always ground wires. (In accordance with national regulations of
the pertinent country.)

Do not connect the ground wire to gas pipes, sewage pipes,
lightning rods, or telephone ground wires.

Combustion gas pipes: can explode or catch fire if there is a gas
leak.

Sewage pipes: no grounding effect is possible if hard plastic
piping is used.

Telephone ground wires and lightning rods: dangerous when
struck by lightning due to abnormal rise in electrical potential in
the grounding.

This unit uses an inverter, and therefore generates noise, which
will have to be reduced to avoid interfering with other devices.
The outer casing of the product may take on an electrical charge
due to leaked electrical current, which will have to be discharged
with the grounding.

Be sure to install an earth leak detector. (One that can handle
higher harmonics.)
(This unit uses an inverter, which means that an earth leak
detector capable of handling high harmonics needs to be used
in order to prevent malfunctioning of the earth leak detector
itself.)

Earth leak detector which are especially for protecting ground-
faults should be used in conjunction with main switch or fuse for
use with wiring.

This unit has a negative phase protection circuit. (If it operates,
only operate the unit after correcting the wiring.)

7.4.

Examples

System example 

(See figure 18)

Field line connection

L1, L2, L3, N-phase of the power cord should be clamped to the
plastic bracket using field supplied clamp material.

The green and yellow striped wrapped wires should be used for
grounding. 

(See figure 14)

(See figure 20)

1

Field power supply

2

Main switch

3

Earth leak detector

4

Fuse

5

Cool/heat selector

6

Remote controller

7

Outdoor unit

8

BS unit

9

Indoor unit

Power supply wiring (sheathed cable)

Transmission wiring (sheathed cable)

1

Power supply (400 V, Three-phase)

2

Fuse

3

Grounding wire

4

Earth leak detector

5

Attach insulation sleeves

6

Power supply terminal block

7

Ground wire

8

Clamp the ground wires along with the power wires using field supplied 
clamps.

9

Clamp each power wire separately to the plastic bracket using field 
supplied clamps.

10

When wiring, do not allow the ground wires to contact the compressor 
lead wires. If the wires contact each other, adverse effects may occur 
to other units.

11

When connecting two wires to one terminal, ensure that the crimp-style 
terminals face with each other back to back.
Moreover, make sure that the wire of the smaller gauge is located 
above.

12

Crimp-style terminal

13

Wire gauge: Small

14

Wire gauge: Large

15

Plastic bracket

1

Electric wiring

2

Wiring between units

3

Clamp to the electric box with field supplied clamps.

4

When routing out the power/ground wires from the right side:

5

When routing the remote control cord and inter-unit wiring, secure 
clearance of 50 mm or more from the power wiring. Ensure that the 
power wiring does not contact any heated sections ( 

 ).

6

Clamp to the back of the column support with field supplied clamps.

7

When routing out the inter-unit wirings from the opening for piping:

8

When routing out the power/ground wires from the front:

9

When routing out the ground wires from the left side:

10

Grounding wire

11

When wiring, pay attention not to detach the acoustic insulators from 
the compressor.

12

Power supply

13

Fuse

14

Earth leakage breaker

15

Ground wire

16

Unit A

17

Unit B

18

Unit C

Summary of Contents for VRV II REYQ8M8W1B

Page 1: ...NUAL REYQ8M8W1B REYQ10M8W1B REYQ12M8W1B REYQ14M8W1B REYQ16M8W1B REYQ18M REYQ20M REYQ22M REYQ24M REYQ26M REYQ28M REYQ30M REYQ32M REYQ34M REYQ36M REYQ38M REYQ40M REYQ42M REYQ44M REYQ46M REYQ48M System a...

Page 2: ...0 0 0 1000 1 50 0 1500 1500 1 2 4 5 3 5 3 3 1 722 737 80 80 765 A B 5 6 7 5 6 7 15 1 11 12 13 8 9 8 9 A B A B 1 1 2 10 14 3 4 7 15 14 7 1 2 4 5 6 7 3 7 8 9 10 11 1 5 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 2 1...

Page 3: ...15 15 F2 F2 F1 F1 A B C Q1Q2 3 2 1 1 5 5 5 4 A B C F1 F2 F1 F2 Q1 Q2 A B C F1 F1 F2 F2 Q1 Q2 F1 F2 F1 F2 F1 F2 F1 F2 1 2 9 3 4 5 6 7 TO IN D UNIT TO OUT D UNIT TO MULTI UNIT A1P F1 IN D OUT D F2 F2 F1...

Page 4: ...20 12 13 14 15 16 17 18 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 NOTES 20 REYQ8 10 REYQ12 16...

Page 5: ...e esta declara o se refere 09 10 erkl rer under eneansvar at klimaanl gmodellerne som denne deklaration vedr rer 11 deklarerar i egenskap av huvudansvarig att luftkonditioneringsmodellerna som ber rs...

Page 6: ...the REYQ M units Installation of the indoor units is not described in this manual Always refer to the installation manual supplied with these units for their installation REYQ8 16M8W1B VRVII System ai...

Page 7: ...dequate for servicing and the minimum space for air inlet and air outlet is available Refer to figure 1 and choose one of the possibilities In case of an installation site where only the sides A B hav...

Page 8: ...this manual may cause electronic noise generated from radio frequency energy The equipment complies to specifications that are designed to provide reasonable protection against such interference Howe...

Page 9: ...refrigeration technician and must comply with relevant local and national regulations CAUTION TO BE TAKEN WHEN BRAZING REFRIGERANT PIPING Do not use flux when brazing copper to copper refrigerant pipi...

Page 10: ...flare nuts included with the unit Using different flare nuts may cause the refrigerant to leak 5 Protection against contamination when installing pipes Take measures to prevent foreign materials like...

Page 11: ...own in the figure A or figure B Prohibited pattern Change to pattern 1 or 2 Change as shown in the figure below 3 If the piping length between the outdoor unit connecting pipe kits or between the outd...

Page 12: ...e total capacity of all the indoor units connected below the refnet header Note 250 type cannot be connected below the refnet header How to choose an outdoor branch kit needed if the outdoor unit capa...

Page 13: ...REYQ12 12 7 28 6 REYQ14 16 22 2 REYQ18 15 9 REYQ20 22 28 6 REYQ24 34 9 REYQ26 34 19 1 REYQ36 41 3 REYQ38 48 34 9 Outdoor capacity type Piping size outer diameter Normal size Size up REYQ8 10 9 5 12 7...

Page 14: ...uum drying Then after leaving the system in vacuum for 1 hour confirm that the vacuum gauge does not rise Stop valve operation procedure Introduction Confirm the sizes of the stop valves connected to...

Page 15: ...mm Flare shape 9 5 32 7 39 9 12 8 13 2 12 7 49 5 60 3 16 2 16 6 15 9 61 8 75 4 19 3 19 7 NOTE You must use a torque wrench but if you are obliged to install the unit without a torque wrench you may fo...

Page 16: ...within 30 minutes repeat step 2 If the operation stops immediately after restart there is a possibility that the system is overcharged The refrigerant cannot be charged more than this amount 4 After...

Page 17: ...installing a phase advancing capacitor not only will deteriorate power factor improvement effect but also may cause capacitor abnormal heating accident due to high frequency waves Therefore never inst...

Page 18: ...pped wires should be used for grounding See figure 14 See figure 20 1 Field power supply 2 Main switch 3 Earth leak detector 4 Fuse 5 Cool heat selector 6 Remote controller 7 Outdoor unit 8 BS unit 9...

Page 19: ...n of the cup washer An improper ground connection may prevent a good ground from being achieved 1 2 1 Round pressure terminal 2 Power wire Tightening torque N m M8 Power terminal block 5 5 7 3 M8 Grou...

Page 20: ...ts must be 30 m See the paragraph Fixing field line connection on page 14 A Electric wiring diagram Printed on the back of the electric box lid 1 Cut off the shaded zones before use 2 Through cover 3...

Page 21: ...switch box cover 1 when you are done Location of the dip switches leds and buttons Led state Throughout the manual the state of the leds is indicated as follows OFF ON blinking Setting the dip switch...

Page 22: ...ld setting For field setting For test operation For resetting the address when the wiring is changed or when an additional indoor unit is installed NOTE If you get confused in the middle of the settin...

Page 23: ...ic solenoid valve may rise during this operation The following items are automatically checked Check for miswiring Check if stop valves are open Check of refrigerant charge Automatic judgement of pipi...

Page 24: ...ation to ON The indoor unit and the outdoor unit expansion valves will fully open and some solenoid valves will be turned on The H1P led is on and the remote controller indicates test operation and ex...

Page 25: ...te the smallest room volume m3 In a case such as the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calcu...

Page 26: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW23712 1...

Reviews: