16

8. B

EFORE

 

OPERATION

8.1.

Service precautions

8.2.

Checks before initial start-up

After the installation, check the following before switching on the
circuit breaker:

1

The position of the switches that require an initial setting

Make sure that switches are set according to your application
needs before turning the power supply on.

2

Power supply wiring and transmission wiring

Use a designated power supply and transmission wiring and
make sure that it has been carried out according to the
instructions described in this manual, according to the wiring
diagrams and according to local and national regulations.

3

Pipe sizes and pipe insulation

Make sure that correct pipe sizes are installed and that the
insulation work is properly executed.

4

Additional refrigerant charge

The amount of refrigerant to be added to the unit should be
written on the included "Added Refrigerant" plate and attached
to the rear side of the front cover.

5

Insulation test of the main power circuit

Using a megatester for 500 

V, check that the insulation

resistance of 2 M

 or more is attained by applying a voltage of

500 V DC between power terminals and earth. Never use the
megatester for the transmission wiring.

6

Installation date

Be sure to keep record of the installation date on the sticker on
the rear of the upper front panel according to EN60335-2-40.

8.3.

Field setting

If required, carry out field settings according to the following
instructions. Refer to the service manual for more details.

Opening the switch box and handling the switches

When carrying out field settings,
remove the switch box cover (1).
Operate the switches with an
insulated stick (such as a ball-point
pen) to avoid touching live parts.

Do not forget to re-attach the switch
box cover (1) when you are done.

Location of the dip switches, leds and buttons

Led state

Throughout the manual the state of the leds is indicated as follows:

 OFF

 ON

 blinking

Setting the dip switches 

(only in case of a heat pump unit)

WARNING: ELECTRIC SHOCK 

Caution when performing service to inverter
equipment

Do not touch live parts for 10 minutes after the power
supply is turned off because of high voltage risk.

Additionally, measure the points as shown in the
figure with a tester and confirm that the voltage of the
capacitor in the main circuit is not higher than
50 V DC.

Then pull out the connector (N3, P3). Make sure you
do not touch live parts.

After the service is finished, re-connect the connector
(N3, P3). Otherwise malfunction may occur.

Caution when obtaining access to terminals

Before obtaining access to terminals in the switch
box, all supply circuits must be disconnected.

Be careful when removing the cover. Touching live
parts may cause electric shock.

After servicing is finished, re-attach the cover.
Otherwise malfunction may occur due to intrusion of
water or other foreign materials.

NOTE

Be safe!

In order to protect the PCB, touch the switch box
casing with your hand so as to eliminate static
electricity from your body before performing service.

Make sure that the circuit breaker on the power supply
panel of the installation is switched off.

Attach the power wire securely.

Introducing power with a missing N-phase or with a
mistaken N-phase will break the equipment.

N3 P3

1

Led H1~7P

2

Push button switches 
BS1~BS5

3

Dip switch 1 (DS1: 1~4)

4

Dip switch 2 (DS2: 1~4)

5

Dip switch 3 (DS3: 1~2)

What to set with dip switch DS1

1

COOL/HEAT selector (refer to 

"Field line connection: 

transmission wiring and cool/heat selection" on page 14

)

(

 = not installed = factory setting)

2~4

NOT USED
DO NOT CHANGE THE FACTORY SETTING.

What to set with dip switch DS2

1~4

NOT USED
DO NOT CHANGE THE FACTORY SETTING.

What to set with dip switch DS3

1+2

NOT USED
DO NOT CHANGE THE FACTORY SETTING.

1

1
2

4
3
5

OFF

Summary of Contents for VRV II REYQ8M8W1B

Page 1: ...NUAL REYQ8M8W1B REYQ10M8W1B REYQ12M8W1B REYQ14M8W1B REYQ16M8W1B REYQ18M REYQ20M REYQ22M REYQ24M REYQ26M REYQ28M REYQ30M REYQ32M REYQ34M REYQ36M REYQ38M REYQ40M REYQ42M REYQ44M REYQ46M REYQ48M System a...

Page 2: ...0 0 0 1000 1 50 0 1500 1500 1 2 4 5 3 5 3 3 1 722 737 80 80 765 A B 5 6 7 5 6 7 15 1 11 12 13 8 9 8 9 A B A B 1 1 2 10 14 3 4 7 15 14 7 1 2 4 5 6 7 3 7 8 9 10 11 1 5 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 2 1...

Page 3: ...15 15 F2 F2 F1 F1 A B C Q1Q2 3 2 1 1 5 5 5 4 A B C F1 F2 F1 F2 Q1 Q2 A B C F1 F1 F2 F2 Q1 Q2 F1 F2 F1 F2 F1 F2 F1 F2 1 2 9 3 4 5 6 7 TO IN D UNIT TO OUT D UNIT TO MULTI UNIT A1P F1 IN D OUT D F2 F2 F1...

Page 4: ...20 12 13 14 15 16 17 18 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 NOTES 20 REYQ8 10 REYQ12 16...

Page 5: ...e esta declara o se refere 09 10 erkl rer under eneansvar at klimaanl gmodellerne som denne deklaration vedr rer 11 deklarerar i egenskap av huvudansvarig att luftkonditioneringsmodellerna som ber rs...

Page 6: ...the REYQ M units Installation of the indoor units is not described in this manual Always refer to the installation manual supplied with these units for their installation REYQ8 16M8W1B VRVII System ai...

Page 7: ...dequate for servicing and the minimum space for air inlet and air outlet is available Refer to figure 1 and choose one of the possibilities In case of an installation site where only the sides A B hav...

Page 8: ...this manual may cause electronic noise generated from radio frequency energy The equipment complies to specifications that are designed to provide reasonable protection against such interference Howe...

Page 9: ...refrigeration technician and must comply with relevant local and national regulations CAUTION TO BE TAKEN WHEN BRAZING REFRIGERANT PIPING Do not use flux when brazing copper to copper refrigerant pipi...

Page 10: ...flare nuts included with the unit Using different flare nuts may cause the refrigerant to leak 5 Protection against contamination when installing pipes Take measures to prevent foreign materials like...

Page 11: ...own in the figure A or figure B Prohibited pattern Change to pattern 1 or 2 Change as shown in the figure below 3 If the piping length between the outdoor unit connecting pipe kits or between the outd...

Page 12: ...e total capacity of all the indoor units connected below the refnet header Note 250 type cannot be connected below the refnet header How to choose an outdoor branch kit needed if the outdoor unit capa...

Page 13: ...REYQ12 12 7 28 6 REYQ14 16 22 2 REYQ18 15 9 REYQ20 22 28 6 REYQ24 34 9 REYQ26 34 19 1 REYQ36 41 3 REYQ38 48 34 9 Outdoor capacity type Piping size outer diameter Normal size Size up REYQ8 10 9 5 12 7...

Page 14: ...uum drying Then after leaving the system in vacuum for 1 hour confirm that the vacuum gauge does not rise Stop valve operation procedure Introduction Confirm the sizes of the stop valves connected to...

Page 15: ...mm Flare shape 9 5 32 7 39 9 12 8 13 2 12 7 49 5 60 3 16 2 16 6 15 9 61 8 75 4 19 3 19 7 NOTE You must use a torque wrench but if you are obliged to install the unit without a torque wrench you may fo...

Page 16: ...within 30 minutes repeat step 2 If the operation stops immediately after restart there is a possibility that the system is overcharged The refrigerant cannot be charged more than this amount 4 After...

Page 17: ...installing a phase advancing capacitor not only will deteriorate power factor improvement effect but also may cause capacitor abnormal heating accident due to high frequency waves Therefore never inst...

Page 18: ...pped wires should be used for grounding See figure 14 See figure 20 1 Field power supply 2 Main switch 3 Earth leak detector 4 Fuse 5 Cool heat selector 6 Remote controller 7 Outdoor unit 8 BS unit 9...

Page 19: ...n of the cup washer An improper ground connection may prevent a good ground from being achieved 1 2 1 Round pressure terminal 2 Power wire Tightening torque N m M8 Power terminal block 5 5 7 3 M8 Grou...

Page 20: ...ts must be 30 m See the paragraph Fixing field line connection on page 14 A Electric wiring diagram Printed on the back of the electric box lid 1 Cut off the shaded zones before use 2 Through cover 3...

Page 21: ...switch box cover 1 when you are done Location of the dip switches leds and buttons Led state Throughout the manual the state of the leds is indicated as follows OFF ON blinking Setting the dip switch...

Page 22: ...ld setting For field setting For test operation For resetting the address when the wiring is changed or when an additional indoor unit is installed NOTE If you get confused in the middle of the settin...

Page 23: ...ic solenoid valve may rise during this operation The following items are automatically checked Check for miswiring Check if stop valves are open Check of refrigerant charge Automatic judgement of pipi...

Page 24: ...ation to ON The indoor unit and the outdoor unit expansion valves will fully open and some solenoid valves will be turned on The H1P led is on and the remote controller indicates test operation and ex...

Page 25: ...te the smallest room volume m3 In a case such as the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calcu...

Page 26: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW23712 1...

Reviews: