18
|
Piping installation
Installer and user reference guide
106
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12
Note:
For side connections, remove the knockout hole on the bottom plate as
shown below:
c
b
a
a
Large knockout hole
b
Drill
c
Points for drilling
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing.
▪
After making the knockout holes, we recommend you remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
18.2.6 To protect against contamination
Protect the piping as described in the following table to prevent dirt, liquid or dust
from entering the piping.
Unit
Installation period
Protection method
Outdoor unit
>1 month
Pinch the pipe
<1 month
Pinch or tape the pipe
Indoor unit
Regardless of the period
Seal the piping and wiring intake holes using sealing material (field supply),
otherwise the capacity of the unit will drop and small animals may enter the
machine.
Example:
passing piping out through the front.
a
a
Seal up the opening (area marked in grey).
▪
Only use clean pipes.
▪
Hold the pipe end downwards when removing burrs.
▪
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles entering the pipe.
Summary of Contents for VRV 5 RXYA8A7Y1B
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ...4P749918 1 2023 12 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...