20
|
Electrical installation
Installer and user reference guide
129
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing and underlying piping.
▪
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
a
b
c
d
a
Knockout hole
b
Burr
c
Remove burrs
d
If there are any possibilities that small animals enter the system through the
knockout holes, close the holes with packing materials (to be prepared on-site)
20.1.4 Guidelines when connecting the electrical wiring
NOTICE
We recommend using solid (single-core) wires. If stranded wires are used, slightly
twist the strands to consolidate the end of the conductor for either direct use in the
terminal clamp or insertion in a round crimp-style terminal.
To prepare stranded conductor wire for installation
Method 1: Twisting conductor
1
Strip insulation (20 mm) from the wires.
2
Slightly twist the end of the conductor to create a "solid-like" connection.
Method 2: Using round crimp-style terminal
1
Strip insulation from wires and slightly twist the end of each wire.
2
Install a round crimp-style terminal on the end of the wire. Place the round
crimp-style terminal on the wire up to the covered part and fasten the
terminal with the appropriate tool.
Summary of Contents for VRV 5 RXYA8A7Y1B
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ...4P749918 1 2023 12 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...