14 About the box
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage and completeness. Any
damage or missing parts MUST be reported immediately to the claims agent of
the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
Prepare in advance the path along which you want to bring the unit to its final
installation position.
▪
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
▪
Lift the unit preferably with a crane and 2 belts of at least 8 m long as shown in
the figure below. Always use protectors to prevent belt damage and pay
attention to the position of the unit's centre of gravity.
d
d
b
b
d
c
a
c
a
Packaging material
b
Belt sling
c
Opening
d
Protector
NOTICE
Use a belt sling of ≤20 mm wide that adequately bears the weight of the unit.
▪
A forklift can only be used for transport as long as the unit remains on its pallet
as shown above.
In this chapter
Summary of Contents for VRV 5 RXYA8A7Y1B
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ...4P749918 1 2023 12 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...