![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-ffq25b8v1b/super-multi-nx-ffq25b8v1b_service-manual_4061781411.webp)
SiBE121021_C
Outdoor Unit - 50~75 Class
Removal Procedure
399
1.9
Removal of Compressor
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Remove the terminal
cover.
2
Disconnect the
compressor lead wires.
3
Detach the overload
protector.
(R12914)
Terminal cover
V(yellow)
U(red)
W(blue)
(R5602)
(R12916)
Overload protector