![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-ffq25b8v1b/super-multi-nx-ffq25b8v1b_service-manual_4061781392.webp)
Outdoor Unit - 50~75 Class
SiBE121021_C
380
Removal Procedure
15
The figure shows the
arrangement of the wire
harnesses under the
electrical box.
16
Pull out the clamp of the
thermistor lead wire.
2. Remove the electrical
box.
1
Remove the 2 screws
of the earth terminal.
2
Remove the screws on
the terminal board and
disconnect all the
connecting wires.
Step
Procedure
Points
Thermistor lead wire
(R12905)