7 Commissioning

Installer reference guide

22

RZQG7 RZQG71~12 RZQG140L7Y1L

Split system air conditioners

4P473074-1A – 2019.04

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

7.4

To perform a test run

This task is only applicable when using the BRC1E52 user interface.

▪ When  using  BRC1E51,  see  the  installation  manual  of  the  user

interface.

▪ When using BRC1D, see the service manual of the user interface.

NOTICE

Do not interrupt the test run.

INFORMATION

Backlight.

  To  perform  an  ON/OFF  action  on  the  user

interface,  the  backlight  does  not  need  to  be  lit.  For  any
other  action,  it  needs  to  be  lit  first.  The  backlight  is  lit  for
±30 seconds when you press a button.

1

Perform introductory steps.

#

Action

1

Open the liquid stop valve and gas stop valve by
removing the cap and turning counterclockwise with a
hex wrench until it stops.

2

Close the service cover to prevent electric shocks.

3

Turn ON power for at least 6 hours before starting
operation to protect the compressor.

4

On the user interface, set the unit to cooling operation
mode.

2

Start the test run.

#

Action

Result

1

Go to the home menu.

Cool

Set to

28

°C

2

Press at least 4 seconds.

The Service Settings menu
is displayed.

3

Select Test Operation.

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact

Field Settings

Demand

Min Setpoints Differential

Group Address

4

Press.

Test Operation is
displayed on the home
menu.

Cool

Return

Setting

Test Operation

5

Press within 10 seconds.

Test run starts.

3

Check operation for 3 minutes.

4

Check operation of the airflow direction.

#

Action

Result

1

Press.

Return 

Setting 

Return

Setting

Air Volume/direction

Air Volume

Direction

Position 0

Low

2

Select Position 0.

Return 

Setting 

Return

Setting

Air Volume/direction

Air Volume

Direction

Low

Position 0

3

Change the position.

If the airflow flap of the
indoor unit moves,
operation is OK.

If not, operation is not OK.

4

Press.

The home menu is
displayed.

5

Stop the test run.

#

Action

Result

1

Press at least 4 seconds.

The Service Settings menu
is displayed.

2

Select Test Operation.

Return

Setting

Service Settings                   1/3

Test Operation

Maintenance Contact

Field Settings

Demand

Min Setpoints Differential

Group Address

3

Press.

The unit returns to normal
operation, and the home
menu is displayed.

7.5

Error codes when performing a
test run

If  the  installation  of  the  outdoor  unit  has  NOT  been  done  correctly,
the following error codes may be displayed on the user interface:

Error code

Possible cause

Nothing displayed

(the currently set
temperature is not
displayed)

▪ The  wiring  is  disconnected  or  there  is  a

wiring  error  (between  power  supply  and
outdoor  unit,  between  outdoor  unit  and
indoor  units,  between  indoor  unit  and
user interface).

▪ The  fuse  on  the  outdoor  unit  PCB  has

blown out.

E3, E4 or L8

▪ The stop valves are closed.

▪ The air inlet or air outlet is blocked.

E7

There is a missing phase in case of three-
phase power supply units.

Note: 

Operation will be impossible. Turn

OFF the power, recheck the wiring, and
switch two of the three electrical wires.

L4

The air inlet or air outlet is blocked.

U0

The stop valves are closed.

Summary of Contents for RZQG-LV1L

Page 1: ...Installer reference guide Split system air conditioners English Installer reference guide Split system air conditioners RZQG71L9V1L RZQG71L8Y1L RZQG100L8Y1L RZQG125L8Y1L RZQG140L7Y1L...

Page 2: ...the outdoor unit 14 6 4 9 To determine if oil traps are required 15 6 5 Checking the refrigerant piping 15 6 5 1 About checking the refrigerant piping 15 6 5 2 Precautions when checking the refrigeran...

Page 3: ...BURNING Do NOT touch the refrigerant piping water piping or internal parts during and immediately after operation It could be too hot or too cold Give it time to return to normal temperature If you m...

Page 4: ...lation WARNING Make sure there is no oxygen in the system Refrigerant may only be charged after performing the leak test and the vacuum drying In case recharge is required see the nameplate of the uni...

Page 5: ...ting the power supply the current carrying connections must be separated before the earth connection is The length of the conductors between the power supply stress relief and the terminal block itsel...

Page 6: ...now before going on site Installation What to do and know to install the system Commissioning What to do and know to commission the system after it is installed Hand over to the user What to give and...

Page 7: ...of dust is created the unit MUST be covered Choose an installation location with sufficient space for carrying the unit in and out of the site 5 2 1 Installation site requirements of the outdoor unit...

Page 8: ...tdoor unit is designed for outdoor installation only and for ambient temperatures ranging Model Cooling Heating RZQG 15 50 C 20 15 5 C 5 2 2 Additional installation site requirements of the outdoor un...

Page 9: ...iping material Piping material Phosphoric acid deoxidised seamless copper Flare connections Only use annealed material Piping temper grade and thickness Outer diameter Temper grade Thickness t a 6 4 m...

Page 10: ...licable legislation WARNING ALWAYS use multicore cable for power supply cables 6 Installation 6 1 Overview Installation This chapter describes what you have to do and know on site to install the syste...

Page 11: ...ion bolts using nuts with resin washers a If the coating on the fastening area is stripped off the metal can rust easily a 6 3 4 To install the outdoor unit 4 M12 6 3 5 To provide drainage Make sure t...

Page 12: ...ing to the outdoor unit Connecting the refrigerant piping to the indoor unit Installing oil traps Insulating the refrigerant piping Keeping in mind the guidelines for Pipe bending Flaring pipe ends Br...

Page 13: ...pe 4 Flare the pipe Set exactly at the position as shown in the following figure A Flare tool for R410A clutch type Conventional flare tool Clutch type Ridgid type Wing nut type Imperial type A 0 0 5...

Page 14: ...stem cap The stem cap is sealed where indicated with the arrow Do NOT damage it After handling the stop valve tighten the stem cap and check for refrigerant leaks To handle the service cap ALWAYS use...

Page 15: ...r unit is installed higher than the outdoor unit Install an oil trap every 10 m height difference a b 10 m a Rising gas piping with oil trap b Liquid piping The outdoor unit is installed higher than t...

Page 16: ...3 Vacuum the system for at least 2 hours to a manifold pressure of 0 1 MPa 1 bar 4 After turning the pump OFF check the pressure for at least 1 hour 5 If you do NOT reach the target vacuum or CANNOT...

Page 17: ...ports indicated on the figures below opened The location is depending on model type RZQG71_V1 a b c RZQG71_Y1 a b c RZQG100 140_Y1 a b c a Internal service port b Stop valve with service port liquid...

Page 18: ...1 2 2 kg tCO2 eq GWP kg 1000 kg kg GWP XXX RXXX a f c d e a If a multilingual fluorinated greenhouse gases label is delivered with the unit see accessories peel off the applicable language and stick i...

Page 19: ...terminal c b b a c a B B a Terminal b Screw c Flat washer O Allowed X NOT allowed Tightening torques Item Tightening torque N m M4 X1M 1 2 1 8 Item Tightening torque N m M4 earth 1 2 1 4 M5 X1M 2 0 3...

Page 20: ...Connecting to the frame When cables are routed from the unit a protection sleeve for the conduits PG insertions can be inserted at the knockout hole When you do not use a wire conduit protect the wir...

Page 21: ...esult NOTICE Do NOT operate the unit until the refrigerant piping is complete when operated this way the compressor will break NOTICE Cooling operation mode Perform the test run in cooling operation m...

Page 22: ...Group Address 4 Press Test Operation is displayed on the home menu Cool Return Setting Test Operation 5 Press within 10 seconds Test run starts 3 Check operation for 3 minutes 4 Check operation of the...

Page 23: ...arge in kg 1000 9 1 Overview Maintenance and service This chapter contains information about Maintenance safety precautions The yearly maintenance of the outdoor unit 9 2 Maintenance safety precaution...

Page 24: ...ion 11 3 To pump down DANGER RISK OF EXPLOSION Pump down Refrigerant leakage If you want to pump down the system and there is a leak in the refrigerant circuit Do NOT use the unit s automatic pump dow...

Page 25: ...c d e eB eD A B C D E HB HU HD B 100 A B C 100 100 100 B E 100 1000 500 A B C E 150 150 150 1000 500 D 500 D E 1000 500 500 500 B D 100 B D E HB HD HB HU 250 750 1000 500 HU HB HU 250 1000 1000 500 H...

Page 26: ...equired to install a roof but seal the gap between the upper and lower units to prevent discharged air from flowing back to the suction side through the bottom of the unit 12 2 Piping diagram Outdoor...

Page 27: ...F8U RZQG71_V1 F1U F2U Fuse F6U Fuse T 3 15 A 250 V F7U F8U Fuse F 1 0 A 250 V F1U F8U RZQG_Y1 F1U F2U Fuse 31 5 A 250 V F1U A2P Fuse T 5 0 A 250 V F3U F6U Fuse T 6 3 A 250 V F7U F8U Fuse F 1 0 A 250 V...

Page 28: ...explaining how to install configure and maintain it Operation manual Instruction manual specified for a certain product or application explaining how to operate it Maintenance instructions Instruction...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ...4P473074 1A 2019 04 Copyright 2017 Daikin...

Reviews: