background image

11 Disposal

Installer reference guide

24

RZQG7 RZQG71~12 RZQG140L7Y1L

Split system air conditioners

4P473074-1A – 2019.04

WARNING

Prevent hazards due to inadvertent resetting of the thermal
cut-out:  power  to  this  appliance  MUST  NOT  be  supplied
through  an  external  switching  device,  such  as  a  timer,  or
connected to a circuit that is regularly turned ON and OFF
by the utility.

DANGER: RISK OF BURNING

11

Disposal

NOTICE

Do  NOT  try  to  dismantle  the  system  yourself:  dismantling
of  the  system,  treatment  of  the  refrigerant,  oil  and  other
parts  MUST  comply  with  applicable  legislation.  Units
MUST  be  treated  at  a  specialised  treatment  facility  for
reuse, recycling and recovery.

11.1

Overview: Disposal

Typical workflow

Disposing of the system typically consists of the following stages:

1

Pumping down the system.

2

Bringing the system to a specialized treatment facility.

INFORMATION

For more details, see the service manual.

11.2

About pump down

The  unit  is  equipped  with  an  automatic  pump  down  function,  with
which you can collect all refrigerant from the system into the outdoor
unit.

NOTICE

The outdoor unit is equipped with a low pressure switch or
a low pressure sensor to protect the compressor by turning
it OFF. NEVER short-circuit the low pressure switch during
pump down operation.

11.3

To pump down

DANGER: RISK OF EXPLOSION

Pump  down  –  Refrigerant  leakage.

  If  you  want  to  pump

down  the  system,  and  there  is  a  leak  in  the  refrigerant
circuit:

▪ Do NOT use the unit's automatic pump down function,

with  which  you  can  collect  all  refrigerant  from  the
system  into  the  outdoor  unit. 

Possible  consequence:

Self-combustion  and  explosion  of  the  compressor
because of air going into the operating compressor.

▪ Use  a  separate  recovery  system  so  that  the  unit's

compressor does NOT have to operate.

1

Turn ON the main power supply switch.

2

Make  sure  the  liquid  stop  valve  and  the  gas  stop  valve  are
open.

3

Press the pump down button (BS4) for at least 8 seconds. BS4
is located on the PCB in the outdoor unit (see wiring diagram).

Result: 

The  compressor  and  outdoor  unit  fan  start

automatically, and the indoor unit fan might start automatically.

4

±2 minutes after the compressor started, close the 

liquid stop

valve

.  If  it  is  not  closed  properly  during  compressor  operation,

the system cannot be pumped down.

5

Once  the  compressor  stops  (after  2~5  minutes),  close  the 

gas

stop valve

.

Result: 

The  pump  down  operation  is  finished.  The  user

interface  may  display  "

"  and  the  indoor  pump  may  continue

operating. This is NOT a malfunction. Even if you press the ON
button  on  the  user  interface,  the  unit  will  NOT  start.  To  restart
the unit, turn OFF the main power supply switch and turn it ON
again.

6

Turn OFF the main power supply switch.

NOTICE

Make sure to reopen both stop valves before restarting the
unit.

Summary of Contents for RZQG-LV1L

Page 1: ...Installer reference guide Split system air conditioners English Installer reference guide Split system air conditioners RZQG71L9V1L RZQG71L8Y1L RZQG100L8Y1L RZQG125L8Y1L RZQG140L7Y1L...

Page 2: ...the outdoor unit 14 6 4 9 To determine if oil traps are required 15 6 5 Checking the refrigerant piping 15 6 5 1 About checking the refrigerant piping 15 6 5 2 Precautions when checking the refrigeran...

Page 3: ...BURNING Do NOT touch the refrigerant piping water piping or internal parts during and immediately after operation It could be too hot or too cold Give it time to return to normal temperature If you m...

Page 4: ...lation WARNING Make sure there is no oxygen in the system Refrigerant may only be charged after performing the leak test and the vacuum drying In case recharge is required see the nameplate of the uni...

Page 5: ...ting the power supply the current carrying connections must be separated before the earth connection is The length of the conductors between the power supply stress relief and the terminal block itsel...

Page 6: ...now before going on site Installation What to do and know to install the system Commissioning What to do and know to commission the system after it is installed Hand over to the user What to give and...

Page 7: ...of dust is created the unit MUST be covered Choose an installation location with sufficient space for carrying the unit in and out of the site 5 2 1 Installation site requirements of the outdoor unit...

Page 8: ...tdoor unit is designed for outdoor installation only and for ambient temperatures ranging Model Cooling Heating RZQG 15 50 C 20 15 5 C 5 2 2 Additional installation site requirements of the outdoor un...

Page 9: ...iping material Piping material Phosphoric acid deoxidised seamless copper Flare connections Only use annealed material Piping temper grade and thickness Outer diameter Temper grade Thickness t a 6 4 m...

Page 10: ...licable legislation WARNING ALWAYS use multicore cable for power supply cables 6 Installation 6 1 Overview Installation This chapter describes what you have to do and know on site to install the syste...

Page 11: ...ion bolts using nuts with resin washers a If the coating on the fastening area is stripped off the metal can rust easily a 6 3 4 To install the outdoor unit 4 M12 6 3 5 To provide drainage Make sure t...

Page 12: ...ing to the outdoor unit Connecting the refrigerant piping to the indoor unit Installing oil traps Insulating the refrigerant piping Keeping in mind the guidelines for Pipe bending Flaring pipe ends Br...

Page 13: ...pe 4 Flare the pipe Set exactly at the position as shown in the following figure A Flare tool for R410A clutch type Conventional flare tool Clutch type Ridgid type Wing nut type Imperial type A 0 0 5...

Page 14: ...stem cap The stem cap is sealed where indicated with the arrow Do NOT damage it After handling the stop valve tighten the stem cap and check for refrigerant leaks To handle the service cap ALWAYS use...

Page 15: ...r unit is installed higher than the outdoor unit Install an oil trap every 10 m height difference a b 10 m a Rising gas piping with oil trap b Liquid piping The outdoor unit is installed higher than t...

Page 16: ...3 Vacuum the system for at least 2 hours to a manifold pressure of 0 1 MPa 1 bar 4 After turning the pump OFF check the pressure for at least 1 hour 5 If you do NOT reach the target vacuum or CANNOT...

Page 17: ...ports indicated on the figures below opened The location is depending on model type RZQG71_V1 a b c RZQG71_Y1 a b c RZQG100 140_Y1 a b c a Internal service port b Stop valve with service port liquid...

Page 18: ...1 2 2 kg tCO2 eq GWP kg 1000 kg kg GWP XXX RXXX a f c d e a If a multilingual fluorinated greenhouse gases label is delivered with the unit see accessories peel off the applicable language and stick i...

Page 19: ...terminal c b b a c a B B a Terminal b Screw c Flat washer O Allowed X NOT allowed Tightening torques Item Tightening torque N m M4 X1M 1 2 1 8 Item Tightening torque N m M4 earth 1 2 1 4 M5 X1M 2 0 3...

Page 20: ...Connecting to the frame When cables are routed from the unit a protection sleeve for the conduits PG insertions can be inserted at the knockout hole When you do not use a wire conduit protect the wir...

Page 21: ...esult NOTICE Do NOT operate the unit until the refrigerant piping is complete when operated this way the compressor will break NOTICE Cooling operation mode Perform the test run in cooling operation m...

Page 22: ...Group Address 4 Press Test Operation is displayed on the home menu Cool Return Setting Test Operation 5 Press within 10 seconds Test run starts 3 Check operation for 3 minutes 4 Check operation of the...

Page 23: ...arge in kg 1000 9 1 Overview Maintenance and service This chapter contains information about Maintenance safety precautions The yearly maintenance of the outdoor unit 9 2 Maintenance safety precaution...

Page 24: ...ion 11 3 To pump down DANGER RISK OF EXPLOSION Pump down Refrigerant leakage If you want to pump down the system and there is a leak in the refrigerant circuit Do NOT use the unit s automatic pump dow...

Page 25: ...c d e eB eD A B C D E HB HU HD B 100 A B C 100 100 100 B E 100 1000 500 A B C E 150 150 150 1000 500 D 500 D E 1000 500 500 500 B D 100 B D E HB HD HB HU 250 750 1000 500 HU HB HU 250 1000 1000 500 H...

Page 26: ...equired to install a roof but seal the gap between the upper and lower units to prevent discharged air from flowing back to the suction side through the bottom of the unit 12 2 Piping diagram Outdoor...

Page 27: ...F8U RZQG71_V1 F1U F2U Fuse F6U Fuse T 3 15 A 250 V F7U F8U Fuse F 1 0 A 250 V F1U F8U RZQG_Y1 F1U F2U Fuse 31 5 A 250 V F1U A2P Fuse T 5 0 A 250 V F3U F6U Fuse T 6 3 A 250 V F7U F8U Fuse F 1 0 A 250 V...

Page 28: ...explaining how to install configure and maintain it Operation manual Instruction manual specified for a certain product or application explaining how to operate it Maintenance instructions Instruction...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ...4P473074 1A 2019 04 Copyright 2017 Daikin...

Reviews: