5 Installation

Installation and operation manual

21

RYYQ+RYMQ+RXYQ8~20T7Y1B
VRV IV system air conditioner
4P370473-1C – 2016.07

p< p>

R410A

N2

C

D

b

c

e

a

g

h

f

d

A

B

a

Pressure reducing valve

b

Nitrogen

c

Weighing scales

d

Refrigerant R410A tank (siphon system)

e

Vacuum pump

f

Liquid line stop valve

g

Gas line stop valve

h

Equalising line stop valve (only for RYMQ)

A

Valve A

B

Valve B

C

Valve C

D

Valve D

4

Do one of the following:

If

Then

4a

The calculated additional
refrigerant amount is reached
by above pre-charging
procedure

Close valves D and B and
disconnect the manifold
connection to the liquid line.

4b

The total amount of
refrigerant could not be
charged by pre-charging

Close valves D and B,
disconnect the manifold
connection to the liquid line,
and perform steps 5~6.

INFORMATION

If  the  total  additional  refrigerant  amount  was  reached  in
step  4  (by  pre-charging  only),  record  the  amount  of
refrigerant  that  was  added  on  the  additional  refrigerant
charge  label  provided  with  the  unit  and  attach  it  on  the
back side of the front panel.

Additionally, input the additional refrigerant amount into the
system via setting [2-14].

Perform 

the 

test 

procedure 

as 

described 

in

"7 Commissioning" on page 29

.

Charging refrigerant

5

After  pre-charging,  connect  valve  A  to  the  refrigerant  charge
port and charge the remaining additional refrigerant through this
port.  Open  all  outdoor  unit  stop  valves.  At  this  point,  valve  A
must remain closed!

p< p>

R410A

a

c

d

b

A

a

Weighing scales

b

Refrigerant R410A tank (siphon system)

c

Vacuum pump

d

Refrigerant charge port

A

Valve A

INFORMATION

For  a  multi  outdoor  unit  system,  it  is  not  required  to
connect all charge ports to a refrigerant tank.

The  refrigerant  will  be  charged  with  ±22  kg  in  1  hour  time
at an outdoor temperature of 30°C DB or with ±6 kg at an
outdoor temperature of 0°C DB.

If  you  need  to  speed  up  in  case  of  a  multiple  outdoor
system, connect the refrigerant tanks to each outdoor unit.

NOTICE

▪ The refrigerant charging port is connected to the piping

inside  the  unit.  The  unit's  internal  piping  is  already
factory  charged  with  refrigerant,  so  be  careful  when
connecting the charge hose.

▪ After  adding  the  refrigerant,  do  not  forget  to  close  the

lid  of  the  refrigerant  charging  port.  The  tightening
torque for the lid is 11.5 to 13.9 N•m.

▪ In  order  to  ensure  uniform  refrigerant  distribution,  it

may take the compressor ±10 minutes to start up after
the unit has started operation. This is not a malfunction.

6

Proceed with one of the following:

6a

"5.6.6 Step 6a: To automatically charge refrigerant" on
page 21

6b

"5.6.7 Step 6b: To manually charge refrigerant" on page 22

INFORMATION

After charging refrigerant:

▪ Record  the  additional  refrigerant  amount  on  the

refrigerant  label  provided  with  the  unit  and  attach  it  to
the backside of the front panel.

▪ Input  the  additional  refrigerant  amount  into  the  system

via setting [2‑14].

▪ Perform 

the 

test 

procedure 

described 

in

"7 Commissioning" on page 29

.

5.6.6

Step 6a: To automatically charge
refrigerant

INFORMATION

The automatic refrigerant charging has limits as described
below.  Out  of  these  limits,  the  system  cannot  operate  the
automatic refrigerant charging:

▪ Outdoor temperature: 0~43°C DB.

▪ Indoor temperature: 10~32°C DB.

▪ Total indoor unit capacity: ≥80%.

When  "

  "  or  "

"  starts  flashing  (ready  for  charging),  push

BS2  within  5  minutes.  Open  valve  A.  If  BS2  is  not  pushed  within  5
minutes, a malfunction code will appear:

If

Then

Heating operation

"

" will be flashing. Push BS2 to

restart the procedure.

Cooling operation

Malfunction code "

" will appear. Push

BS1 to abort and restart the procedure.

Test run including detailed refrigerant status check is required to use
the 

leak 

detection 

functionality. 

More 

information, 

see

"7 Commissioning" on page 29

.

If

Then

"

", "

", or "

"

appears

Push BS1 to finish the automatic
charging function procedure. The
ambient conditions are favourable to
execute the test run.

"

", or "

" appears

The ambient conditions are NOT
favourable to execute the test run. Push
BS1 to finish the automatic charging
procedure.

INFORMATION

In case a malfunction code occurred during this automatic
charging  procedure,  the  unit  will  stop  and  indicate  "

"

flashing. Push BS2 to restart the procedure.

Summary of Contents for RXYQ10T7Y1B

Page 1: ...ration manual VRV IV system air conditioner RYYQ8T7Y1B RYYQ10T7Y1B RYYQ12T7Y1B RYYQ14T7Y1B RYYQ16T7Y1B RYYQ18T7Y1B RYYQ20T7Y1B RYMQ8T7Y1B RYMQ10T7Y1B RYMQ12T7Y1B RYMQ14T7Y1B RYMQ16T7Y1B RYMQ18T7Y1B RY...

Page 2: ...muutettuina v platn m zn n Smjernice kako je izmijenjeno ir nyelv ek s m dos t saik rendelkez seit z p niejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z...

Page 3: ...stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS TSmin Mini...

Page 4: ...rror codes when charging refrigerant 22 5 6 9 Checks after charging refrigerant 22 5 6 10 To fix the fluorinated greenhouse gases label 22 5 7 Connecting the electrical wiring 22 5 7 1 Field wiring Ov...

Page 5: ...accessories are available in the unit a d 1 1 e 1 3P328191 1 BE SURE TO FILL OUT THE BLANKS WHICH ARE NEEDED FOR AFTER SALE SERVICES REQUESTFORTHEINDICATIONOFINSTALLATIONINFORMATION 1 RECORD OF INDOOR...

Page 6: ...t operation Depending on the type of outdoor unit which is chosen some functionality will or will not exist It will be indicated throughout this installation manual and brought to your attention Certa...

Page 7: ...l oils or moisture should be prevented from getting mixed into the system NOTICE The piping and other pressure containing parts shall be suitable for refrigerant Use phosphoric acid deoxidised seamles...

Page 8: ...ing length is allowed to be more than 90 m b Pipe size up is NOT allowed The pipe thickness of the refrigerant piping shall comply with the applicable legislation The minimal pipe thickness for R410A...

Page 9: ...e of 3 multi units the connection diameter of outdoor to T joint has to be kept In case of 2 multi units the connection pipe has to have the largest diameter There is never a connection of the equalis...

Page 10: ...harged to the system Total system refrigerant charge Z O R P O Standard factory charge of outdoor unit R Additional refrigerant charge according to liquid piping diameter length and outdoor unit speci...

Page 11: ...n wiring exceeds these limits it may result in communication error For non standard combinations Calculate the recommended fuse capacity Formula Calculate by adding the minimum circuit amps of each us...

Page 12: ...red installation is on a solid longitudinal foundation steel beam frame or concrete The foundation must be larger than the grey marked area 729 613 929 AB AA a mm Minimum foundation a Anchor point 4 H...

Page 13: ...ion label a attached to the joint comes to the top Do not tilt the joint more than 7 5 see view A Do not install the joint vertically see view B a a A B 7 5 7 5 a Caution label X Not allowed O Allowed...

Page 14: ...ise to close Shaft Valve body Hexagonal wrench Cap valve lid Service port 9 5 5 4 6 6 4 mm 13 5 16 5 11 5 13 9 12 7 8 1 9 9 18 0 22 0 15 9 13 5 16 5 6 mm 23 0 27 0 19 1 27 0 33 0 8 mm 22 5 27 5 25 4 5...

Page 15: ...outdoor unit has finished the initialisation to apply setting 2 21 Leak test and vacuum drying Checking the refrigerant piping involves Checking for any leakages in the refrigerant piping Performing v...

Page 16: ...bar 5 Torr 2 Check that with the vacuum pump turned off the target vacuum is maintained for at least 1 hour 3 Should you fail to reach the target vacuum within 2 hours or maintain the vacuum for 1 ho...

Page 17: ...ems recommended to first pre charge a portion of refrigerant through the liquid line before proceeding with the actual automatic or manual charging This step is included in below procedure see 5 6 5 T...

Page 18: ...frigerant to reach R Q Step 2 3 Open valves C D and B to the liquid and equalising line Charge the equalising line to maximally 0 05 MPa then close valve C and disconnect its connection to the manifol...

Page 19: ...Open valve A Charge remaining amount of refrigerant P kg R Q P Depending on ambient conditions the unit will decide to perform autocharge operation in heating or cooling mode Close valve A Push BS3 to...

Page 20: ...ppear e 2 indoor temperature out of range and e 3 outdoor temperature out of range Push BS1 to leave program Charging is finished Fill in the amount on the additional refrigerant charge label Input th...

Page 21: ...is connected to the piping inside the unit The unit s internal piping is already factory charged with refrigerant so be careful when connecting the charge hose After adding the refrigerant do not for...

Page 22: ...Indoor unit is out of temperature range for leak detection operation Retry when ambient conditions are satisfied Outdoor unit is out of temperature range for leak detection operation Retry when ambie...

Page 23: ...ed wire nipples or rubber bushings into the knockout holes a b c d a Knockout hole b Burr c Remove burrs d If there are any possibilities that small animals enter the system through the knockout holes...

Page 24: ...onnecting wiring for the indoor units is connected The base unit is the outdoor unit to which the interconnecting wiring for the indoor units is connected 5 7 5 To finish the transmission wiring After...

Page 25: ...Perform special actions automatic refrigerant charge testrun etc Perform field settings demand operation low noise etc DIP switches By operating the DIP switches it is possible to DS1 1 COOL HEAT sel...

Page 26: ...all indoor units When the communication between indoor units and outdoor unit s is established and normal the 7 segment display indication state will be as below default situation when shipped from fa...

Page 27: ...nd last malfunction code 1 19 The 3rd last malfunction code 1 29 1 30 1 31 Shows the estimated leaked refrigerant amount kg based on 1 29 The latest leak detection operation 1 30 The 2nd last leak det...

Page 28: ...ctivated 2 20 Description 1 Activated To stop the manual additional refrigerant charge operation when the required additional refrigerant amount is charged push BS3 If this function was not aborted by...

Page 29: ...finished field piping electrical wiring air purge See installation manual of the indoor units for details 7 2 Checklist before commissioning After the installation of the unit first check the followin...

Page 30: ...to have reliable data gathering during the test operation See ambient limitations in the information table on 5 6 6 Step 6a To automatically charge refrigerant on page 21 In case Hydrobox units or RA...

Page 31: ...out the malfunction code The malfunction code will be displayed intermittent Example Code Example Main code Sub code With an interval of 1 second the display will switch between main code and sub code...

Page 32: ...after subcool HE malfunction R5T A1P X30A Check connection on PCB or actuator Liquid temperature sensor coil malfunction R4T A1P X30A Check connection on PCB or actuator Gas temperature sensor after...

Page 33: ...onfirm indoor unit mix is allowed Connection malfunction over indoor units or type mismatch R410A R407C RA Hydrobox etc Check if other indoor units have malfunction and confirm indoor unit mix is allo...

Page 34: ...e for servicing and the minimum space for air inlet and air outlet is available refer to the figure below and choose one of the possibilities a b a c d a b a e d e c a b a e d f c a b a e b d c a b a...

Page 35: ...TION For a legend explaining the figures below refer to the end of this topic Piping diagram RYYQ8 12 sv sv M HPS INV M1C R3T S1NPL S1NPH S1PH R6T R5T R7T R1T M1F R4T R8T 10 12HP R21T j g i o p k m a...

Page 36: ...ct your installer to receive more information and professional advice 10 1 System layout Your VRV IV heat pump series outdoor unit can be one of following models Model Description RYYQ Single continuo...

Page 37: ...ll continue heating operation at a reduced level during defrost operation It will guarantee a decent comfort level indoor A heat storage element in the outdoor unit will provide the energy to de ice t...

Page 38: ...ion on page 38 for details To stop 5 Press the ON OFF button on the user interface once again Result The operation lamp goes out and the system stops operating NOTICE Do not turn off power immediately...

Page 39: ...ire of a burner a heater or a cooker may result in a harmful gas Turn off any combustible heating devices ventilate the room and contact the dealer where you purchased the unit Do not use the system u...

Page 40: ...cking all above items it is impossible to fix the problem yourself contact your installer and state the symptoms the complete model name of the unit with manufacturing number if possible and the insta...

Page 41: ...changeover is controlled by the cool heat changeover remote control switch Ask your dealer where the remote control switch is installed 14 2 3 Symptom Fan operation is possible but cooling and heatin...

Page 42: ...used for the first time in a long time This is because dust has gotten into the unit 14 2 13 Symptom The units can give off odours The unit can absorb the smell of rooms furniture cigarettes etc and...

Page 43: ......

Page 44: ...4P370473 1 C 0000000 4P370473 1C 2016 07 Copyright 2014 Daikin...

Reviews: