HIGH CEILING INSTALLATION

(1)

This unit can be installed in ceilings up to 3.8 meters high. 
If the ceiling height exceeds 2.7 meters, however, connect 
the connector on the terminal board (A2P) of indoor units as 
shown in the figure below.

(2)

Match with setting of 

(1)

 and apply air outlet blocking pad.

For FXKQ25 · 32 · 40MVE
• Apply to the left side drain pan opening (3 locations) as 

shown in the figure.

For FXKQ63MVE
• Apply to the right side drain pan opening (3 locations) as 

shown in the figure.

9-3

WIRING EXAMPLE 

• Fit the power supply wiring of each unit with a switch and fuse 

as shown in the drawing. 

COMPLETE SYSTEM EXAMPLE (3 systems)

1. When using 1 remote controller for 1 indoor unit. (Nor-

mal operation)

2. For group control or use with 2 remote controllers

PC board

MIF

X3A

X2A

X1A

NORMAL

HIGH

Terminal board (A2P)

MIF

X3A

X2A

X1A

NORMAL

HIGH

(Factory set)

Insert

Insert

Power supply wiring

Transmission wiring

Switch

Fuse

Power supply

Main
switch

Remote controller

Indoor unit

BS unit
(Only for
Heat
recovery system)

L N

L N

IN/D OUT/D

F

1

F

2

F

1

F

2

Control box

L N

L N

P

1

P

2

P

1

P

2

F

1

F

2

T

1

T

2

P

1

P

2

P

1

P

2

F

1

F

2

T

1

T

2

L N

P

1

P

2

P

1

P

2

F

1

F

2

T

1

T

2

L N

L N

P

1

P

2

P

1

P

2

F

1

F

2

T

1

T

2

L N

Outdoor unit

No. 1
System

Indoor 
unit A

Indoor 
unit B

Indoor 
unit C

Most
downstream
Indoor unit 

Power supply

220-240V

50Hz

or

220V

60Hz

Power supply

220-240V

50Hz

or

220V

60Hz

Power supply

220-240V

50Hz

or

220V

60Hz

Power supply

220-240V

50Hz

or

220V

60Hz

IN/D OUT/D

F1 F2 F1 F2

Control box

L N

P

1

P

2

P

1

P

2

F

1

F

2

T

1

T

2

L N

P

1

P

2

F

1

F

2

T

1

T

2

L N

P

1

P

2

F

1

F

2

T

1

T

2

L N

P

1

P

2

F

1

F

2

T

1

T

2

P

1

P

2

P

1

P

2

L N

Outdoor unit

No. 2
System

Indoor unit A

Indoor unit B

Indoor unit C

Most 
downstream
indoor unit

For use with 2
remote controllers

Power supply

220-240V

50Hz

or

220V

60Hz

Note: It is not necessary to designate 

indoor unit address when using 
group control. 
The address is automatically set 
when power is activated.

Fig. 1

01_EN_3P086156-8F.fm  Page 9  Wednesday, March 19, 2003  6:55 PM

Summary of Contents for FXKQ25MVE

Page 1: ...MANO PARA LEER EN CASO DE TENER ALGUNA DUDA PRIMA DELL INSTALLAZIONE LEGGERE ATTENTAMENTE QUESTE ISTRUZIONI TENERE QUESTO MANUALE A PORTATA DI MANO PER RIFERIMENTI FUTURI LEES DEZE INSTRUCTIES ZORGVU...

Page 2: ...rmidade com a s seguinte s norma s ou outro s documento s normativo s desde que estes sejam utilizados de acordo com as nossas instru es overholder f lgende standard er eller andet andre retningsgiven...

Page 3: ...g to local laws and regulations and this installation manual An insufficient power supply capacity or improper electrical construction may lead to electric shocks or fire Make sure that all wiring is...

Page 4: ...Also in vehicles or vessels This unit both indoor and outdoor is suitable for installation in a commercial and light industrial environment If installed as a household appliance it could cause electro...

Page 5: ...ight exceeds 2 7 meters however the connector of terminal board A2P must be replaced and an air outlet blocking pad must be installed Refer to HIGH CEILING INSTALLATION P 9 3 Use suspension bolts for...

Page 6: ...and paper pattern for installation have been adjusted to the dimensions of the ceiling opening Be sure to establish thorough communi cation with those who are to do the ceiling work 4 Check the unit i...

Page 7: ...absolutely sure to execute heat insulation works on the pipe connecting section after checking gas leakage by thor oughly studying the following figure and using the attached heat insulating materials...

Page 8: ...ing piping Secure a downward gradient of 1 100 or more for the drain pipe To accomplish this mount supporting brackets at an interval of 1 1 5 m Precautions when doing drain up piping work Make sure t...

Page 9: ...d switch and wiring instructions Be sure to ground the air conditioner Do not connect the ground wire to gas and water pipes light ning rods or telephone ground wires Gas pipes might cause explosions...

Page 10: ...ws Use the correct screwdriver for tightening the terminal screws If the blade of screwdriver is too small the head of the screw might be damaged and the screw will not be properly tightened If the te...

Page 11: ...actory set Insert Insert Power supply wiring Transmission wiring Switch Fuse Power supply Main switch Remote controller Indoor unit BS unit Only for Heat recovery system L N L N IN D OUT D F1 F2 F1 F2...

Page 12: ...terminals T1 and T2 of the terminal block for remote controller 2 Actuation The following table explains FORCED OFF and ON OFF OPERATIONS in response to Input A 3 How to select FORCED OFF and ON OFF O...

Page 13: ...No to 1 Then set second code position No to 01 for FORCED OFF and 02 for ON OFF OPERATION FORCED OFF at factory set 12 TEST OPERATION Refer to the installation manual of the outdoor unit The operatio...

Page 14: ...0303 HT 3P086156 8J EM02A082A...

Reviews: