Not recommendable but in case of emergency

You must use a torque wrench but if you are obliged to install the 
unit without a torque wrench, you may follow the installation 
method mentioned below.

After the work is finished, make sure to check that there is 
no gas leak.

When you keep on tightening the flare nut with a spanner, there 
is a point where the tightening torque suddenly increases. From 
that position, further tighten the flare nut the angle shown below:

Table 4

7.

DRAIN PIPING WORK

〈〈

〈〈

〈〈

〈〈

Rig the drain pipe as shown below and take measures 

against condensation.  Improperly rigged piping could lead 
to leaks and eventually wet furniture and belongings.

〉〉

〉〉

〉〉

〉〉

(1)

Carry out the drain piping
• Keep piping as short as possible and slope it downwards 

so that air may not remaine trapped inside the pipe.

• The diameter of the drain pipe should be greater than or 

equal to the diameter of the connecting pipe (vinyl tube; 
pipe size: 25 mm; outer dimension: 32 mm).

• Use the drain hose and metal clamp. Insert the drain 

hose into the drain socket, up to the white tape. 
Tighten the metal clamp until the screw head is less than 
4 mm from the hose.

CAUTION

Setting the unit at an angle opposite to the drain piping 
might cause leaks.

• Wrap the sealing pad over the clamp and drain hose to 

insulate.

• Insulate the drain hose inside the building.

While referring to the figure on the right, insulate the 
clamp and drain hose with the large sealing pad.

• If the drain hose cannot be sufficiently set on a slope, 

execute the drain raising piping.

• Secure a downward gradient of 1/100 or more for the 

drain pipe. To accomplish this, mount supporting brackets 
at an interval of 1 - 1.5 m.

〈〈〈〈

Precautions when doing drain-up piping work.

〉〉〉〉

 

• Make sure the drain-up piping is at most 330 mm high.
• Stand the drain-up piping horizontally, and make sure it is 

not further than 300 mm from the base of the drain 
socket.

• Use the following outline if laying concentrated drain pip-

ing.

• If converging multiple drain pipes, install according to the 

procedure shown below.

Select converging drain pipes whose gauge is suitable for the 
operating capacity of the unit.

(2)

After piping work is finished, check drainage flows 
smoothly.
• Open the inspection opening, add approximately 1liter of 

water slowly into the drain pan and check drainage flow.

NOTE

• Use the drain outlet for maintenance to drain water from the 

drain pan.

WHEN ELECTRIC WIRING WORK IS FINISHED

• Check drainage flow during COOL running, explained under 

“TESTOPERATION”.

WHEN ELECTRIC WIRING WORK IS NOT FINISHED

• Remove the electric parts box lid, connect a power supply 

and remote controller to the terminals.
(Refer to the  

HOW TO CONNECT WIRINGS

  (P.7))

Pipe size

Further tightening 

angle

Recommended arm length 

of tool

φ 

6.4 (1/4”)

60 to 90 degrees

Approx. 150mm

φ 

9.5 (3/8”)

60 to 90 degrees

Approx. 200mm

φ 

12.7 (1/2”)

30 to 60 degrees

Approx. 250mm

φ 

15.9 (5/8”)

30 to 60 degrees

Approx. 300mm

Metal clamp

Drain hose

Tape

4mm

Large sealing pad

Metal clamp

(accessory)

(accessory)

Ceiling slab

300

1-1.5 m

Support bracket

Adjustable 
(   330)

500

170

Drain-up piping

Riser

Drain hose (accessory)

(length: mm)

Metal clamp 
(accessory)

100mm

T-joint converging drain pipes

Inspection opening

Portable pump

Bucket

Drain outlet for maintenance  
(with rubber plug)

01_EN_3P086156-8F.fm  Page 6  Wednesday, March 19, 2003  6:55 PM

Summary of Contents for FXKQ25MVE

Page 1: ...MANO PARA LEER EN CASO DE TENER ALGUNA DUDA PRIMA DELL INSTALLAZIONE LEGGERE ATTENTAMENTE QUESTE ISTRUZIONI TENERE QUESTO MANUALE A PORTATA DI MANO PER RIFERIMENTI FUTURI LEES DEZE INSTRUCTIES ZORGVU...

Page 2: ...rmidade com a s seguinte s norma s ou outro s documento s normativo s desde que estes sejam utilizados de acordo com as nossas instru es overholder f lgende standard er eller andet andre retningsgiven...

Page 3: ...g to local laws and regulations and this installation manual An insufficient power supply capacity or improper electrical construction may lead to electric shocks or fire Make sure that all wiring is...

Page 4: ...Also in vehicles or vessels This unit both indoor and outdoor is suitable for installation in a commercial and light industrial environment If installed as a household appliance it could cause electro...

Page 5: ...ight exceeds 2 7 meters however the connector of terminal board A2P must be replaced and an air outlet blocking pad must be installed Refer to HIGH CEILING INSTALLATION P 9 3 Use suspension bolts for...

Page 6: ...and paper pattern for installation have been adjusted to the dimensions of the ceiling opening Be sure to establish thorough communi cation with those who are to do the ceiling work 4 Check the unit i...

Page 7: ...absolutely sure to execute heat insulation works on the pipe connecting section after checking gas leakage by thor oughly studying the following figure and using the attached heat insulating materials...

Page 8: ...ing piping Secure a downward gradient of 1 100 or more for the drain pipe To accomplish this mount supporting brackets at an interval of 1 1 5 m Precautions when doing drain up piping work Make sure t...

Page 9: ...d switch and wiring instructions Be sure to ground the air conditioner Do not connect the ground wire to gas and water pipes light ning rods or telephone ground wires Gas pipes might cause explosions...

Page 10: ...ws Use the correct screwdriver for tightening the terminal screws If the blade of screwdriver is too small the head of the screw might be damaged and the screw will not be properly tightened If the te...

Page 11: ...actory set Insert Insert Power supply wiring Transmission wiring Switch Fuse Power supply Main switch Remote controller Indoor unit BS unit Only for Heat recovery system L N L N IN D OUT D F1 F2 F1 F2...

Page 12: ...terminals T1 and T2 of the terminal block for remote controller 2 Actuation The following table explains FORCED OFF and ON OFF OPERATIONS in response to Input A 3 How to select FORCED OFF and ON OFF O...

Page 13: ...No to 1 Then set second code position No to 01 for FORCED OFF and 02 for ON OFF OPERATION FORCED OFF at factory set 12 TEST OPERATION Refer to the installation manual of the outdoor unit The operatio...

Page 14: ...0303 HT 3P086156 8J EM02A082A...

Reviews: