Outdoor Unit
SiBE01-503
94
Removal Procedure
2. Outdoor Unit
2.1
Removal of Panels
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
The
stop valve cover
can be removed when
the fixed screw is
removed.
As three hooks are provided
(at three portions), slide the
cover downward to remove.
The forced cooling operation
in the pumping down mode
can be carried out by
pushing the operation switch
on the main unit for five
seconds. (The existing
models can do it through the
switch on the PC board just
as well.)
The layout of the connection
ports for the flares has been
changed to horizontal
position from vertical
position.
(R4746)
Summary of Contents for FTYN25DV3B ATY20DV2
Page 1: ...SiBE01 503 SPLIT Pair D Series Applied Models zNon Inverter Pair Heat Pump...
Page 5: ...SiBE01 503 iv Table of Contents Index i Drawings Flow Charts iii...
Page 10: ...SiBE01 503 List of Function 1 Part 1 List of Function 1 Functions 2...
Page 13: ...Functions SiBE01 503 4 List of Function...
Page 14: ...SiBE01 503 Specifications 5 Part 2 Specifications 1 Specifications 6...
Page 35: ...Control Specification SiBE01 503 26 Functions and Control...
Page 59: ...Instructions SiBE01 503 50 System Configuration...
Page 79: ...Check SiBE01 503 70 Service Diagnosis...
Page 117: ...Others SiBE01 503 108 Others...