![background image](http://html1.mh-extra.com/html/daikin/ft25cv1a/ft25cv1a_service-manual_2459308176.webp)
Si01-406
R25/35CV1A, RY25/35CVMA
Removal Procedure
165
3. R25/35CV1A, RY25/35CVMA
3.1
Removal of Panels
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
The
stop valve cover
can be removed when
the fixed screw is
removed.
As three hooks are provided
(at three portions), slide the
cover downward to remove.
The forced cooling operation
in the pumping down mode
can be carried out by
pushing the operation switch
on the main unit for five
seconds. (The existing
models can do it through the
switch on the PC board just
as well.)
The layout of the connection
ports for the flares has been
changed to horizontal
position from vertical
position.
Summary of Contents for FT25CV1A
Page 7: ...Si01 406 vi Table of Contents...
Page 15: ...Functions Si01 406 4 List of Function...
Page 21: ...Specifications Si01 406 10 Specifications...
Page 205: ...Wiring Diagrams Si01 406 194 Appendix...
Page 209: ...Si01 406 iv Index...