Si01-406
FT25/35CV1A, FTY25/35CVMA
Removal Procedure
141
4
Disengage the hooks of
the pipe retainer on the
back.
5
Pull auxiliary pipe
forward to an angle of
10 to 20 degrees.
Be careful to prevent pipe
deformation.
6
Disengage hooks
located right and left
side, and pull heat
exchanger forward.
The hooks are
symmetrically placed in
the right and the left.
Lift the heat exchanger
slightly upward to the right,
and the left hook comes to
be disengaged easily.
Step
Procedure
Points
Summary of Contents for FT25CV1A
Page 7: ...Si01 406 vi Table of Contents...
Page 15: ...Functions Si01 406 4 List of Function...
Page 21: ...Specifications Si01 406 10 Specifications...
Page 205: ...Wiring Diagrams Si01 406 194 Appendix...
Page 209: ...Si01 406 iv Index...