![background image](http://html1.mh-extra.com/html/daikin/floor-standing-type-f-series/floor-standing-type-f-series_service-manual_4065090153.webp)
SiBE06-708_A
Indoor Unit
Removal Procedure
142
1.3
Removal of Electrical Box
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
2
Remove the 2 earth
screws.
Unfasten the hook and
open the sensor PCB
fixing plate.
3
Remove the front
shield plate.
4
To detach the
connection wires,
remove the 1 screw
from the wiring fixture
and remove the 4
screws from the
terminal board.
Sensor PCB fixing plate
Hook
(R6781)
Earth
screws
Front shield plate
(R6782)
Wiring fixture
(R6783)
Terminal
board
Connection
wires