SiBE06-708_A
Control Specification
Function and Control
52
3.10 Defrost Control
Outline
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than a certain value to finish.
Detail
Conditions for Starting Defrost
The starting conditions is determined with the outdoor temperature and the outdoor heat
exchanger temperature.
The system is in heating operation.
The compressor operates for 6 minutes.
More than minutes of accumulated time pass since the start of the operation, or ending
the previous defrosting.
Conditions for Canceling Defrost
The judgment is made with outdoor heat exchanger temperature. ( °C)
RK(X)S25/35F2V1B
RK(X)S25/35G2V1B
RK(X)S25/35G2V1B9
RK(X)S50F2V1B
RK(X)S50G2V1B
(minutes)
28
28
44
(Hz)
76
76
55
(Hz)
86
86
90
(seconds)
50
50
60
(seconds)
60
60
120
(seconds)
600
600
460
(seconds)
50
60
30
(pulse)
450
450
450
(pulse)
350
350
450
(pulse)
450
450
450
(°C)
4 ~ 22
4 ~ 18
4 ~ 12
Frequency
Compressor
Four way valve
Fan
ON
OFF
ON
OFF
ON
OFF
0Hz
Hz
Hz
5 sec.
pulse
pulse
pulse
Initial opening
PI control
5 sec.
sec.
(R12211)
Electronic expansion
valve opening
sec.
sec.
sec.