CARRY OUT THE WORK GIVING CAUTION 
TO THE FOLLOWING ITEMS AND AFTER THE 
WORK IS COMPLETED, CHECK THEM AGAIN.

(1) Items to be checked after the installation work is 

completed

Items to be checked

In case of defective

Are the indoor and outdoor units 

rigidly fixed?

Drop · vibration · 
noise

Is the installation work of the outdoor 

and indoor units completed?

Does not operate · 
burnout

Have you carried out air tight test 

with the test pressure specified in 
the outdoor unit installation manual?

Does not cool / Does 
not heat

Is the insulation of refrigerant piping 
and drain piping completely carried 

out? 

Water leakage

Does the drain flow out smoothly?

Water leakage

Is the power supply voltage identical 
to that stated in the name plate on 

the air conditioner?

Does not operate · 
burnout

Are you sure that there is no wrong 

wiring or piping or no loose wiring?

Does not operate · 
burnout

Is grounding completed?

Danger in case of 
leakage

Are the sizes of electric wiring ac-

cording to the specification?

Does not operate · 
burnout

Is any of air outlets or inlets of the 
indoor and outdoor units blocked 

with obstacles?

If so, it could cause the capacity 
to drop due to fan-speed drop or 
malfunction of equipment. 

Does not cool /  
Does not heat

Have you recorded the refrigerant 
piping length and the refrigerant 

charge added?

Refrigerant charge 
amount is not clear

Make sure to recheck the items of 

SAFETY CONSIDERATIONS.

(2) Items to be checked at time of delivery 

Items to be checked

Have you carried out field setting? (if necessary)

Are the control box cover, the air filter and the suction grille 
attached?

Is the cool air discharged during the cooling operation and 

the warm air discharged during the heating operation? Have 

you checked to make sure the indoor unit does not make 

unpleasant air-discharged sounds?

Have you explained how to operate the air conditioner while 
showing the operation manual to the customer? 

Have you explained the description of cooling, heating, pro

-

gram dry and automatic (cooling/heating) while showing the 

operation manual to the customer?

If you set the fan speed at thermostat OFF, did you explain 
the set fan speed to the cus tomer?

Have you handed the operation manual and the installation 

manual to the customer?

Points of the operation explanation

In addition to the general usage, since the items in the 

operation manual with the 

WARNING and  

CAUTION marks are likely to result in human 

bodily injuries and property damages, it is neces sary 

not only to explain these items to the customer but 

also to have the customer read them.

2.  SELECTION OF INSTALLATION LOCA-

TION

Hold the hanger brackets at 4 locations to move the 

indoor unit when unpacking or after unpacked, and do not 

apply force to the piping (refrigerant and drain) and resin 

parts.

If the temperature and humidity in the ceiling is likely to 

exceed 86°F (30°C), RH80%, additionally stick insulation 

to the indoor unit.

Use the insulation such as glass wool or polyethylene 

that has thickness of 3/8 in. (10 mm) or more. However, 

keep the insulated outside dimension smaller than the 

ceiling opening so that the unit may go through the open-

ing at installation.

The direction of air discharge can be selected. Sealing 

material of air discharge outlet is available option for 

4-way with sealed corners and 3-way.

(1)  Select the installation location that meets the follow-

ing conditions and get approval from the cus tomer. 

•  Where the cool and warm air spreads evenly in the room.

•  Where there are no obstacles in the air passage.

•  Where drainage can be ensured.

•  Where the ceiling surface is not inclined.

• 

Where there is sufficient strength to withstand the 
weight of the indoor unit. If the strength is insufficient, 

the indoor unit may vibrate and get in contact with the 
ceiling and generate noise.

• 

Where a space sufficient for installation and service 

can be ensured. 

(Refer to Fig. 1)

•  Where the piping length between the indoor and the out-

door units is ensured within the allowable length. Refer 
to the installation manual attached to the outdoor unit.

• 

Where there is no risk of flammable gas leak.

Required installation space [in. (mm)]

Suction Discharge

Discharge 

Floor level

At least 

100 (2500) 

from the floor

Fig. 1

MODEL NAME (FCQ-AAVJU)

 [in. (mm)]

BYCQ54EEFU

BYCQ54EEGFU

18 · 24 

10 (261)

13-1/4 (341)

30 · 36 · 42 · 48

11-3/4 (303)

14-7/8 (383)

01_EN_3P693452-2.indd   2

2022/08/09   16:00:09

Summary of Contents for FCQ18AAVJU

Page 1: ...wner Lire soigneusement ces instructions avant l installation Conserver ce manuel port e de main pour r f rence ult rieure Ce manuel doit tre donn au propri taire de l quipement Lea cuidadosamente est...

Page 2: ...use severe injury or death After completing the installation work check that the refrigerant gas does not leak throughout the system Do not install unit in an area where flammable materials are presen...

Page 3: ...e earth s protection again harmful ultraviolet radiation R410A can contribute to the greenhouse effect if it is released Therefore take proper measures to check for the tightness of the refrigerant pi...

Page 4: ...ity from the body when carrying out wiring and the control box cover is removed The electric parts may be damaged 1 1 ACCESSORIES Check if the following accessories are attached to the indoor unit Nam...

Page 5: ...set the fan speed at thermostat OFF did you explain the set fan speed to the cus tomer Have you handed the operation manual and the installation manual to the customer Points of the operation explana...

Page 6: ...center of the sensing area is located in the center of the product 32 in 800 mm above the floor in case of the infrared presence sensor or 0 in 0 mm above the floor in case of the infrared floor sens...

Page 7: ...pening dimension Make the ceiling opening required for installation at the installation location and carry out refrigerant drain pip ing power supply wiring remote controller wiring and transmission w...

Page 8: ...ndoor unit with four screws 6 At this time put the installation pattern paper 5 to the indoor unit with the triangle marks on the indoor unit and those on the installation pattern paper 5 aligned Inst...

Page 9: ...efrigerant leakage To prevent contamination or moisture from getting into the piping take measures such as pinch ing or taping the piping Do not mix substance other than the specified refrig erant suc...

Page 10: ...n Union joint Refrigerant piping Joint insulating material 9 Accessory Piping holding plate screw 2 locations Gas piping Liquid piping Liquid piping insulating method Indoor unit Indoor unit Clamp 4 A...

Page 11: ...ng of piping due to residue 6 DRAIN PIPING WORK 1 Carry out drain piping Carry out drain piping so that drainage can be ensured Select the piping diameter equal to or larger than except for riser that...

Page 12: ...ot apply excessive force to the attached drain hose 1 by bending or twisting it This could cause water leakage In case of centralized drain piping carry out piping work according to the procedure show...

Page 13: ...terial 14 to perform the thermal insulation of the drain socket Do not connect the drain piping directly to the sewage that gives off ammonia odor The ammonia in the sewage may go through the drain pi...

Page 14: ...or insulate the wirings properly Insulation sleeve Ring type crimp style terminal Wiring Use the required wires connect and fix securely so that external force may not apply to the terminals Use a pr...

Page 15: ...pply wiring grounding wiring X2M Terminal block for remote controller wiring transmission wiring X1M Printed Circuit Board Forced off Remote controller wiring X1M Transmission wiring X1M Remote contro...

Page 16: ...1 system When using 1 remote controller Normal operation Indoor unit Power supply single phase 60Hz 208 230V Outdoor unit Remote controller L1L2 IN D OUT D F1 F2 F1 F2 P1 P2 P1 P2 F1 F2 T1 T2 Control...

Page 17: ...If test operation is carried out before mounting the decora tion panel check the horizontal blade action after the panel is mounted 9 FIELD SETTING Refer to also the installation manual attached to th...

Page 18: ...Differential MODE NO FIRST CODE NO SECOND CODE NO 1 8 F 1 C 12 22 2 01 0 9 F 0 5 C 02 9 7 SETTING AIR DISCHARGE DIRECTION When changing air discharge setting 2 way or 3 way air discharge set the SECON...

Page 19: ...the air conditioner until the interior finish work is completed If the air conditioner is operated the inside of the indoor units may be polluted by substances generated from the coating and adhesives...

Page 20: ...2209 HT 3P693452 2 EM21A045 Daikin Texas Technology Park 19001 Kermier Road Waller TX 77484 U S A 00_CV_3P693452 2 indd 2 2022 07 07 16 49 30...

Reviews: