background image

Installation manual

3

EWLD120~540MBYNN

Condenserless water-cooled water chillers

4PW22686-1

U

NPACKING

 

AND

 

PLACING

 

THE

 

UNIT

1

Remove the wooden beams from the unit. 

2

Install vibration mountings in case of an installation where noise
and vibration might be an impediment.

3

Set the unit on a solid and level foundation.

The unit should be installed on a solid base. It is recommended
to fix the unit on a concrete base with anchor bolts.

Fix anchor bolts into the concrete foundation. When finally fixing
the unit by means of these anchor bolts, make sure that the
washers for channel DIN434, and both field supplied rubber
plates and field supplied raw cork or rubber sheets for better
vibration protection, are installed as indicated.

The concrete foundation should approximately be 100 mm
higher than the floor level for ease of plumbing work and better
drain.

Make sure that the foundation surface is even and flat.

C

ONNECTING

 

THE

 

REFRIGERANT

 

CIRCUIT

Precautions when handling piping

If air, moisture or dust gets in the refrigerant circuit, problems may
occur. Therefore, always take into account the following when
connecting the refrigerant piping:

1.

Use clean and dry pipes only.

2.

Hold the pipe end downwards when removing burrs.

3.

Cover the pipe end when inserting it through a wall so that no dust
and dirt enter.

Connecting the refrigerant circuit

The discharge and liquid line must be welded directly to the remote
condenser piping. For use of the correct pipe diameter see table
below:

Leak test and vacuum drying

The units were checked for leaks by the manufacturer.

After connection of the piping, a leak test must be performed and the
air in the refrigerant piping must be evacuated to a value of 4 mbars
absolute by means of a vacuum pump.

1

Anchor bolt

2

Washer

3

Rubber plate

4

Row cork or rubber sheet

5

Ground

6

Concrete floor

7

Ditch

Anchor bolt

Model

A

Size

Qty

170

300

M20x200

4

260

350

M20x200

4

EWLD340~540

350

M20x270

4

NOTE

The measurement tabulated is based on the fact
the base is made in the ground or on a concrete
floor. In case the base is made on a rigid floor, it is
possible to include thickness of concrete floor in
that of the base.

In case a base is made on concrete floor, make
sure to provide a ditch as shown. It is important to
extract drainage regardless of whether a base is
made in the ground or on the concrete floor (ditch-
sewerage).

Ingredient ratio of the concrete is: cement 1, sand
2 and gravel 3. Insert iron bars of Ø10 at every
interval of 300 mm. The edge of the concrete
base should be planed.

>200

>A

100

>100

50

>930

1

2
3+4

5

6

7

1855

>930

808

>2371

The units are equipped with a refrigerant inlet (discharge
side) and a  refrigerant outlet (liquid side) for the
connection to a remote condenser. This circuit must be
provided by a licensed technician and must comply with all
relevant European and national regulations.

connection (inch)

Model

discharge

liquid

EWLD120

2"1/8

7/8"

EWLD170

2"1/8

1"1/8

EWLD240

2"1/8

1"3/8

EWLD260

2"5/8

1"3/8

EWLD340

2x 2"1/8

2x 1"1/8

EWLD400

2x 2"1/8

1"1/8+1"3/8

EWLD480

2x 2"1/8

2x 1"3/8

EWLD500

2"1/8+2"5/8

2x 1"3/8

EWLD540

2x 2"5/8

2x 1"3/8

Make sure the pipes are filled with N

2

  during welding in

order to protect the pipes against soot.

There should be no blockage (stopvalve, solenoid valve)
between the remote condenser and the provided liquid
injection of the compressor.

Do not purge the air with refrigerants. Use a vacuum pump
to vacuum the installation.

Summary of Contents for EWLD120MBYNN

Page 1: ...INSTALLATION MANUAL EWLD120MBYNN EWLD170MBYNN EWLD240MBYNN EWLD260MBYNN EWLD340MBYNN EWLD400MBYNN EWLD480MBYNN EWLD500MBYNN EWLD540MBYNN Condenserless water cooled water chillers...

Page 2: ...3 24 V K2P M2P L2 L3 SLAVE 1 F18 K2P F8 F9 74 75 76 77 78 79 N L1 F10 F19 230 V 73 24 V K1P M1P L2 L3 MASTER F20 S1S S6S M K1P F11 F12 74 75 76 77 78 79 S10S M M3P SLAVE 2 M2P SLAVE 1 M1P MASTER R8T L...

Page 3: ...es 04 Richtlijnen zoals geamendeerd 05 Directivas seg n lo enmendado 06 Direttive come da modifica 07 v 08 Directivas conforme altera o em 09 10 Direktiver med senere ndringer 11 Direktiv med f retagn...

Page 4: ...evaporator water down to 10 C Daikin Integrated Chiller Network DICN Liquid line solenoid valve Sight glass with moisture indication EWLD120MBYNN EWLD260MBYNN EWLD480MBYNN EWLD170MBYNN EWLD340MBYNN EW...

Page 5: ...se radio interference in which case the user may be required to take adequate measures The units are designed for indoor installation and should be installed in a location that meets the following req...

Page 6: ...e performed and the air in the refrigerant piping must be evacuated to a value of 4 mbars absolute by means of a vacuum pump 1 Anchor bolt 2 Washer 3 Rubber plate 4 Row cork or rubber sheet 5 Ground 6...

Page 7: ...the supplied couplings to the evaporator inlet s Connecting the water outlet pipe containing the outlet water tem perature sensor not for EWLD120 The water outlet pipe containing the outlet water tem...

Page 8: ...listed in the table below The filter kit supplied with the unit must be installed in front of the evaporator water inlet by means of the supplied couplings as shown in the figure The filter has holes...

Page 9: ...on the unit the power circuit must be connected to the terminals 2 4 and 6 of the main isolator switch 2 Connect the earth conductor yellow green to the earthing terminal PE Interconnection cables Vol...

Page 10: ...erature sensor Cable for remote digital controller See remote digital controller in the operation manual 1 A remote digital controller can be connected to the PCB inside the unit by means of a 6 ray c...

Page 11: ...illed out completely tick when checked standard steps to go through before starting the unit 1 Check for external damage 2 Open all shut off valves indicated by a red label OPEN THIS VALVE BEFORE OPER...

Page 12: ...s inlet water evaporator temperature and mixed outlet water evaporator temperature This in order to correct a possible measurement fault The default value of the probe offset is equal to 0 Steering th...

Page 13: ...F all units the pump runs for a time indicated by the setting Slave 3 S3 is configured to operate when its remote start stop switch S6S S3 is pushed by the operator Slave 1 S1 slave 2 S2 and the maste...

Page 14: ...3 shows the system configuration field wiring and terminals for field wiring of this example Purpose Purpose of this system is to keep a buffer at a constant temperature and to feed a load from this...

Page 15: ...er circuit The operation of the water chiller is then controlled by the Digital Display Controller Shut down by switching off the controller and the circuit breaker of the power circuit WARNINGS Emerg...

Page 16: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW22686 1...

Reviews: